Submit an Article
Become a reviewer
Vol 199
Pages:
134-140
Download volume:
RUS
Article

Geomechanical justification of design parameters of room-and-pillar mining system for designing оf deep-lying horizons of SYBR

Authors:
D. V. Sidorov
About authors
  • Ph.D. associate professor National Mineral Resources University (Mining University)
Date submitted:
2011-11-08
Date accepted:
2012-01-18
Date published:
2012-12-29

Abstract

Results of the analysis of factors of mining operations influencing safe conducting are resulted. Technological solutions on the pressure control, allowing messages mining operations on the big depths in rock-bump hazardous conditions are considered. Methodical positions and results of definition of parameters of constructive elements of systems of minings for conditions North Ural bauxite deposits are resulted.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
chamber-and-pillar mining method a goaf a pillar dynamic pressure
Go to volume 199

References

  1. Conducting in hard- rock mechanics: the Lane with English / Under the editorship of H.Bok. Moscow, 1983.
  2. The instruction on safe conducting mining operations on ore and nonmetallic deposits, objects of building of the underground constructions inclined and prone to rock -bumps. RD 06-329- 99. Moscow, 2003.
  3. Petuhov I.M., Linkov А.М. Mechanics of rock bumps and outbursts. Moscow, 1983.
  4. Durability and deformability of rocks / Y.M.Kartashov. B.V.Matveev, G.V.Mikheyev, A.B.Fadeev. Moscow.
  5. Settlement methods in the mechanic of rock bumps and outbursts: The handbook / I.M.Petrov, A.M.Linkov, V.S.Sidorov ,etc. Moscow, 1992.

Similar articles

The information providing of the method оf the regional zoning on the degree of dangerous of manifestation landsliding processes
2012 A. A. Kuzin
Determining of encumbranses on the territory of Kirovsky district of Saint Petersburg
2012 E. N. Bykova, Yu. V. Chernetskaya
Look-ahead estimation of consequences mines works under high-voltage line of electric transfers and monitoring behind their condition
2012 V. N. Gusev, A. S. Mironov, V. L. Trushko, Nguen Suan Bak
Building of construction pit and investigation of displacement wall of the secant pile
2012 S. V. Stepanenko
Definition of area harmful interference in communications construction underground
2012 M. G. Mustafin, A. S. Naumov
Standard and methodical support of estimation of adverse effect of underground construction and monitoring of deformations for conditions of Saint-Petersburg
2012 E. M. Volokhov, S. N. Zelentsov, V. P. Khutskii