Determination of the stress parameters of nearbord areas of open pits, located in highly stressed rock massif
Authors:
About authors
- post-graduate student National Mineral Resources University (Mining University)
Abstract
The parameters of the stress state of nearboard massif of deep ore pitas an example the development of apatite-nepheline Koashvinskoe deposis. This research was performed by numerical simulation using finite elements method.
Область исследования:
(Archived) Geotechnology for development of solid mining fields
References
- Kaplunov D.R., Kalmykov V.N., Rylnikova M.V. Combined geotechnology. Moscow, 2003.
- Kozyrev A.A., Pavlov V.V., Maltsev V.A., Savchenko S.N. The stress state of rock mass in the bottom of a deep pit // Open-powerful Underground ore deposits: Proceedings. KSC RAS. Apatity, 1995.
- Ogorodnikov J.N., Ochkurov V.I., Kuranov A.D.Stress-strain state of the array around development workings when mining stocks pribortovyh career Koashva // Mineral resources of the North: Problems and Solutions: Proceedings of the 8th International Scientific and Practical Conference. Vorkuta, 2010. Vol.1.
- Ogorodnikov J.N., Kuranov A.D. Geomechanicalsubstantiation of the stability of development workings in the development of reserves pribortovyh Koashvinskogo career with the collapse of the undermined side / / Proceedings of the Mining Institute. Saint Petersburg, 2011. Vol.190.
- Svinin V.S. Geomechanical substantiation oftechnology and control systems for rock mass-processing of docking zones underground and open pit (for example, apatite mines of Khibiny): Thesisreferat. Apatity, 2003.
- Sidorov D.V., Kuranov A.D. Assessment of stresspillars in the mines of Open Society «Apatite» // Proceedings of Tula State University. Natural Sciences, Series: «Earth Science». Vol.1. Tula, 2011.
- Guidelines for the safe conduct of mining activities on the deposits, prone and dangerous impact on the rock (the Khibiny apatite-nepheline deposits / KSC RAS. Apatity – Kirovsk, 2010.
- Yakovlev A.V., Ermakov N.I. The stability of theboards of ore mines under the action of tectonic stresses in the array / Ural Branch of RAS Institute of Mining. Ekaterinburg, 2006.
Similar articles
The technics of mutual influenced tunnel’s temporary support stress-strain state prediction with allowance for building technology
2012 A. G. Protosenya, N. A. Belyakov
About determination of potential sliding surface based on stress analysis in pit wall solid
2012 P. I. Yushmanov
Determining of encumbranses on the territory of Kirovsky district of Saint Petersburg
2012 E. N. Bykova, Yu. V. Chernetskaya
Development of the weighted biopolimer drilling mud for workover
2012 Vladimir S. Litvinenko, N. I. Nikolaev