Numerical modeling of deep excavation structures behavior during construction

Authors:
A. G. Protosenya1
D. A. Potemkin2
S. V. Stepanenko3
About authors
  • 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
  • 2 — Ph.D. associate professor National Mineral Resources University (Mining University)
  • 3 — head of department Jet Technology and Construction ltd
Date submitted:
2011-11-15
Date accepted:
2012-01-29
Date published:
2012-12-29

Abstract

Numerical modeling of deep excavation construction is done in plane strain condition. The influence of boundary condition, contact condition between soil and structures, constrain of cantilever wall, thickness of the wall and anchors on the strain condition of the soil is found.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
modeling soil pit finite elements method the pile
Funding:

None

Go to volume 199

References

  1. Ulitsky V.M. Geotechnical support for urban development / V.M.Ulitsky, A.G.Shashkin, K.G. Shashkin. Saint Petersburg, 2010.
  2. Popov M.G. Numerical modelling of pumping station construction under the protection of secant pile wall / M.G.Popov, S.V.Stepanenko // Proceedings of the 10-th international scientific conference «Development of mineral resource of North: problems and solution». Vorkuta, 2012. Vol.1.

Similar articles

Complex method of assesing mechanical condition of rocks in vicinity storehouses of radioactive waste
2012 O. V. Kovalev, S. P. Mozer, I. Yu. Tkhorikov
Experience of works on the waterproofing of underground constructions
2012 V. M. Dianov, A. V. Savich, K. S. Pashin, S. A. Grafkin
Modeling of stress-strain state of ore massive Yakovlevsky caused by mining works under the protection ceiling
2012 O. V. Trushko, A. V. Streletskii
Prediction of the mine working stability in the massif which are crossing zone of weakening
2012 M. G. Popov
Look-ahead estimation of consequences mines works under high-voltage line of electric transfers and monitoring behind their condition
2012 V. N. Gusev, A. S. Mironov, V. L. Trushko, Nguen Suan Bak
Development of the weighted biopolimer drilling mud for workover