Building of underground construction protected enclosing wall and method of displacement forecast of the soil

Article preview

The volumetric model taking and performed mathematical modeling the process of construction of the pit under the enclosing wall of secant piles. The results of mathematical modeling on the horizontal displacements of the pit wall. Set out conditions for the construction of the pit and the main technological solutions.

How to cite: Popov M.G., Stepanenko S.V. Building of underground construction protected enclosing wall and method of displacement forecast of the soil // Journal of Mining Institute. 2012. Vol. 199. p. 55-59.