Building of underground construction protected enclosing wall and method of displacement forecast of the soil

Authors:
M. G. Popov1
S. V. Stepanenko2
About authors
  • 1 — Ph.D. assistant lecturer National Mineral Resources University (Mining University)
  • 2 — head of department Jet Technology and Construction ltd
Date submitted:
2011-11-30
Date accepted:
2012-01-23
Date published:
2012-12-29

Abstract

The volumetric model taking and performed mathematical modeling the process of construction of the pit under the enclosing wall of secant piles. The results of mathematical modeling on the horizontal displacements of the pit wall. Set out conditions for the construction of the pit and the main technological solutions.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
modeling soil pit finite elements method the pile
Funding:

None

Go to volume 199

References

  1. Geotechnical support for urban development / V.M.Ulitsky, A.G.Shashkin, K.G.Shashkin. Saint Petersburg, 2010.

Similar articles

Physical modeling during scientific following of subway structures underground construction in condition of Saint Petersburg
2012 Yu. S. Frolov, A. N. Konkov, A. A. Larionov
Building of construction pit and investigation of displacement wall of the secant pile
2012 S. V. Stepanenko
Numerical modeling of tunnel yield element behaviour
2012 M. A. Karasev, N. A. Belyakov
Study of the influence of the form of security structures erected lava following on the mechanism underlying it rocks displacement
2012 V. N. Mokrienko, S. G. Negrei, D. N. Kurdyumov
Use of hydrogeomechanical monitoring during shielding tunnel for underground station оf Saint Petersburg subway «Admiralteiskaya»
2012 Yu. A. Norvatov, I. B. Petrova, M. V. Sergutin
Creation of the geodetic marking network fixed by reflective sheet
2012 D. A. Afonin