Building of underground construction protected enclosing wall and method of displacement forecast of the soil
About authors
- 1 — Ph.D. assistant lecturer National Mineral Resources University (Mining University)
- 2 — head of department Jet Technology and Construction ltd
Abstract
The volumetric model taking and performed mathematical modeling the process of construction of the pit under the enclosing wall of secant piles. The results of mathematical modeling on the horizontal displacements of the pit wall. Set out conditions for the construction of the pit and the main technological solutions.
Область исследования:
(Archived) Geotechnology for development of solid mining fields
References
- Geotechnical support for urban development / V.M.Ulitsky, A.G.Shashkin, K.G.Shashkin. Saint Petersburg, 2010.
Similar articles
Prediction of high speed railway tunnel induced settlement on the Sants – La Sagrera area (Barcelona)
2012 M. A. Karasev
Features of pumping of the liquefied hydrocarbonic gases on pipelines
2012 E. I. Krapivskii, O. F. Putikov, V. M. Pisarevskii
Building of construction pit and investigation of displacement wall of the secant pile
2012 S. V. Stepanenko
Application of radar scanning system GPRI-2 for monitoring the eath’s surface displacement
2012 M. G. Mustafin, A. K. Omarova, D. V. Mozer