Building of underground construction protected enclosing wall and method of displacement forecast of the soil
About authors
- 1 — National Mineral Resources University (Mining University)
- 2 — Jet Technology and Construction ltd
Abstract
The volumetric model taking and performed mathematical modeling the process of construction of the pit under the enclosing wall of secant piles. The results of mathematical modeling on the horizontal displacements of the pit wall. Set out conditions for the construction of the pit and the main technological solutions.
Similar articles
Influence of magnetic field on the speed metal corrosion tubing rheological properties and product borehole
2012 M. K. Rogachev, M. I. Kuzmin, N. K. Kondrasheva
Estimation of condition tubbing lining escalator tunnel of metro station «Admiralty» by results of lazerno-scanning survey
2012 V. K. Nosov
Rationale for assessing the degree of fracturing rock mass by gpr based on mathematical modeling
2012 V. V. Glazunov, S. M. Danilev
The technics of mutual influenced tunnel’s temporary support stress-strain state prediction with allowance for building technology
2012 A. G. Protosenya, N. A. Belyakov