Building of underground construction protected enclosing wall and method of displacement forecast of the soil

Authors:
M. G. Popov1
S. V. Stepanenko2
About authors
  • 1 — National Mineral Resources University (Mining University)
  • 2 — Jet Technology and Construction ltd
Date submitted:
2011-11-30
Date accepted:
2012-01-23
Date published:
2012-05-01

Abstract

The volumetric model taking and performed mathematical modeling the process of construction of the pit under the enclosing wall of secant piles. The results of mathematical modeling on the horizontal displacements of the pit wall. Set out conditions for the construction of the  pit and the main technological  solutions.

Go to volume 199

Similar articles

Statistical evaluation of the energy rates of the surface miner MTS-250 (Germany)
2012 A. A. Grabovskii
Analysis of existing design procedures pumping mode LPG natural gas pipeline
2012 A. K. Nikolaev, V. P. Dokukin, V. A, Voronov
Estimation of condition tubbing lining escalator tunnel of metro station «Admiralty» by results of lazerno-scanning survey
2012 V. K. Nosov
Technological parameters of vertical shafts, which are sinking in the presence of oil and gas, are proved
2012 A. Yu. Prokopov, V. L. Sklepchuk
Look-ahead estimation of consequences mines works under high-voltage line of electric transfers and monitoring behind their condition
2012 V. N. Gusev, A. S. Mironov, V. L. Trushko, Nguen Suan Bak
Allocation of areas under the coal-mining industry
2012 E. N. Bykova