Building of underground construction protected enclosing wall and method of displacement forecast of the soil

Authors:
M. G. Popov1
S. V. Stepanenko2
About authors
  • 1 — Ph.D. assistant lecturer National Mineral Resources University (Mining University)
  • 2 — head of department Jet Technology and Construction ltd
Date submitted:
2011-11-30
Date accepted:
2012-01-23
Date published:
2012-12-29

Abstract

The volumetric model taking and performed mathematical modeling the process of construction of the pit under the enclosing wall of secant piles. The results of mathematical modeling on the horizontal displacements of the pit wall. Set out conditions for the construction of the pit and the main technological solutions.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
modeling soil pit finite elements method the pile
Funding:

None

Go to volume 199

References

  1. Geotechnical support for urban development / V.M.Ulitsky, A.G.Shashkin, K.G.Shashkin. Saint Petersburg, 2010.

Similar articles

Modeling of stress-strain state of ore massive Yakovlevsky caused by mining works under the protection ceiling
2012 O. V. Trushko, A. V. Streletskii
About the necessity of accounting of geodinamically active fractures zones in cadastral valuation оf settlement earths
2012 V. A. Kiselev, O. A. Tributs
Investigation of the parameters of stressstate nearbord arrays based sequence miningcombined with open-underground mining diamond mine
2012 A. G. Protosenya, A. D. Kuranov, A. N. Shokov
Using of laser scanning survey of barrow for deformation monitoring
2012 A. V. Kovyazin
Valuation of sustainable of pit wall based on data of digital photography of outcrop surfaces
2012 M. G. Mustafin, A. P. Sannikova
Creation of the geodetic marking network fixed by reflective sheet
2012 D. A. Afonin