Building of underground construction protected enclosing wall and method of displacement forecast of the soil

Authors:
M. G. Popov1
S. V. Stepanenko2
About authors
  • 1 — Ph.D. assistant lecturer National Mineral Resources University (Mining University)
  • 2 — head of department Jet Technology and Construction ltd
Date submitted:
2011-11-30
Date accepted:
2012-01-23
Date published:
2012-12-29

Abstract

The volumetric model taking and performed mathematical modeling the process of construction of the pit under the enclosing wall of secant piles. The results of mathematical modeling on the horizontal displacements of the pit wall. Set out conditions for the construction of the pit and the main technological solutions.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
modeling soil pit finite elements method the pile
Go to volume 199

References

  1. Geotechnical support for urban development / V.M.Ulitsky, A.G.Shashkin, K.G.Shashkin. Saint Petersburg, 2010.

Similar articles

Prediction of high speed railway tunnel induced settlement on the Sants – La Sagrera area (Barcelona)
2012 M. A. Karasev
Features of pumping of the liquefied hydrocarbonic gases on pipelines
2012 E. I. Krapivskii, O. F. Putikov, V. M. Pisarevskii
Building of construction pit and investigation of displacement wall of the secant pile
2012 S. V. Stepanenko
Application of radar scanning system GPRI-2 for monitoring the eath’s surface displacement
2012 M. G. Mustafin, A. K. Omarova, D. V. Mozer
Formation of stressed state in temporary tunnel support when constructing a traffic tunnel of north caucasus railway near the slope
2012 M. O. Lebedev
Using of laser scanning survey of barrow for deformation monitoring
2012 A. V. Kovyazin