Building of underground construction protected enclosing wall and method of displacement forecast of the soil

Authors:
M. G. Popov1
S. V. Stepanenko2
About authors
  • 1 — Ph.D. assistant lecturer National Mineral Resources University (Mining University)
  • 2 — head of department Jet Technology and Construction ltd
Date submitted:
2011-11-30
Date accepted:
2012-01-23
Date published:
2012-12-29

Abstract

The volumetric model taking and performed mathematical modeling the process of construction of the pit under the enclosing wall of secant piles. The results of mathematical modeling on the horizontal displacements of the pit wall. Set out conditions for the construction of the pit and the main technological solutions.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
modeling soil pit finite elements method the pile
Go to volume 199

References

  1. Geotechnical support for urban development / V.M.Ulitsky, A.G.Shashkin, K.G.Shashkin. Saint Petersburg, 2010.

Similar articles

Influence of magnetic field on the speed metal corrosion tubing rheological properties and product borehole
2012 M. K. Rogachev, M. I. Kuzmin, N. K. Kondrasheva
Study of the influence of the form of security structures erected lava following on the mechanism underlying it rocks displacement
2012 V. N. Mokrienko, S. G. Negrei, D. N. Kurdyumov
Numerical modeling of tunnel yield element behaviour
2012 M. A. Karasev, N. A. Belyakov
Formation of stressed state in temporary tunnel support when constructing a traffic tunnel of north caucasus railway near the slope
2012 M. O. Lebedev
On estimates of stability chambers underground dissolution in seismically active areas
2012 O. V. Kovalev, S. P. Mozer, I. Yu. Tkhorikov
Безопасные параметры сдвижения земной поверхности при строительстве метрополитена в Санкт-Петербурге
2012 V. P. Khutskii