Submit an Article
Become a reviewer
Vol 33 Iss. 1
Pages:
45-54
Download volume:
RUS
Article

To theoretical researches of loading machines with a bucket working body

Authors:
Ya. P. Grachev
Date submitted:
1955-07-06
Date accepted:
1955-09-25
Date published:
1956-01-01

Abstract

Loading machines with bucket working body UMP-1, PPM-2, PML-5, EPM-2 (Table 1) and others, due to mobility and versatility, have received in the mining industry the greatest distribution. They are the main loading machines when sinking excavations in strong rocks. There are a lot of unsolved problems in the complex study of loading machines operation. Thus, the literature lacks comprehensive data on the study of the main resistances to the introduction of the working body of the machine, there is no methodology for the calculation of loading machines. However, on the study of the processes occurring during the digging of soils to bulk materials by the working bodies of earthmoving machines, there are valuable materials that can be used in the development of theoretical provisions and in the practice of loading machines.

Область исследования:
Power Engineering
Go to volume 33

Similar articles

Feasibility study of wagon capacity selection for coal mines
1956 I. T. Karelin
Engines of the mine automated electric locomotive
1956 А. V. Rys'ev
Automation of control of scraper conveyors
1956 D. M. Belenky
Ways of unification and improvement of belt conveyors design
1956 Ya. B. Kalnitsky, V. D. Zinevich
Ways and prospects of mine transportation development in coal industry
1956 V. I. Gerontiev
About the principles of work of loading machine actuators
1956 V. S. Bersenev