Submit an Article
Become a reviewer
Vol 36 Iss. 1
Pages:
186-195
Download volume:
RUS
Article

Cleaning of flushing solutions during mine shaft drilling

Authors:
V. V. Smirnyakov
Date submitted:
1957-07-16
Date accepted:
1957-09-28
Date published:
1958-04-26

Abstract

Cleaning the bottom hole of drilled rock and bringing it to the surface when drilling shafts and boreholes is one of the main functions performed by the flushing fluid. In the process of drilling, the flushing fluid is contaminated with drilled rock and its percentage in the fluid increases. The high content of drilled rock in the flushing fluid deteriorates its quality, causes collapse of the borehole walls (due to deterioration of the clay coating on its walls) and poses a risk of seizing the drilling tool when flushing is stopped. Besides, the increase in the percentage of rock content in the flushing solution requires more energy for flushing, increases the wear of drilling equipment parts, and significantly reduces the drilling speed.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 36

Similar articles

On power losses in surface equipment of core drilling units
1958 O. S. Golovin
Dependence of specific explosives consumption on the depth of a single ripping charge embedment
1958 Yu. M. Misnik
Alexander M. Alyamsky (1900-1957)
1958 P. I. Mustel
Influence of operating conditions on the working characteristic of organ walls of OK type
1958 B. P. Ovcharenko
On the methodology for setting ore loss and dilution rates for disseminated ore development
1958 P. I. Gorodetskii, N. Z. Galaev
Influence of trip length on core recovery in different rocks
1958 A. P. Rudenko