Cleaning of flushing solutions during mine shaft drilling

Authors:
V. V. Smirnyakov
Date submitted:
1957-07-16
Date accepted:
1957-09-28
Date published:
1958-04-26

Abstract

Cleaning the bottom hole from the drilled rock and bringing it to the surface when drilling shafts and boreholes is one of the main functions performed by the flushing fluid. In the process of drilling the flushing fluid is contaminated with drilled rock and its percentage in the fluid increases. The high content of drilled rock in the flushing fluid deteriorates its quality, causes collapse of the borehole walls (due to deterioration of claying of its walls) and poses a risk of seizing the drilling tool during the termination of flushing. Besides, the increase in the percentage of rock content in the flushing solution requires more energy for flushing, increases the wear of drilling equipment parts, and significantly reduces the drilling speed.

Область исследования:
(Archived) Without section
Go to volume 36

References

  1. -

Similar articles

Ways of improvement of the layer caving system at application of flexible overlap
1958 E. Ya. Makhno
Power losses in surface equipment of core drilling units
1958 O. S. Golovin
Some reserves for increasing labor productivity during preparatory excavations
1958 P. A. Kondrashov
Deformation of mine shaft supports in Donbass and measures to combat it
1958 V. N. Mankov
Determination of air losses and calculation of depression in parallel workings
1958 M. A. Patrushev
Alexander M. Alamsky (1900-1957)
1958 P. I. Mustel