Submit an Article
Become a reviewer
Vol 36 Iss. 1
Pages:
240-255
Download volume:
RUS
Article

On reserves for increasing the productivity of percussion drilling machines

Authors:
V. O. Malchenok
Date submitted:
1957-07-10
Date accepted:
1957-09-30
Date published:
1958-04-26

Abstract

So far, the main means of drilling holes for blasting operations at open‑pit mines are percussion drilling machines. More than 1,500 machines operate at mines and quarries, with a total drilling volume exceeding 3 million linear meters of wells per year. Increasing the productivity of the machines and improving drilling operations have been given much attention in recent years, but drilling productivity still grows very slowly. At mines with good organization of drilling operations, where machine downtime is minimized, drilling productivity has practically not increased in recent years, i.e., the reserves for increasing productivity through organizational measures have been largely used up. To further increase productivity, it is necessary to modernize the machines.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 36

References

  1. Alekseev O. I. Some results of the study of drilling and blasting operations at the Kounrad mine. Sb.:Sovershenstvovanie otkrytoy razrabotki mestorozhdeniy poleznykh iskopaemykh. Ugletekhizdat, 1955. (in Russian)
  2. Kulichikhin N. I. and Vozdvizhensky B. I. Exploration Drilling. Gosgeolizdat, 1949. (in Russian)
  3. Nazarov P. P. Rational Technological Mode of Operation of Shock-Rudder Drilling Machines. Sb.: Sovershenstvovanie otkrytoy razrabotki mestorozhdeniy poleznykh iskopaemykh. Ugletekhizdat, 1955. (in Russian)

Similar articles

About the directions of designing of development systems for thin and medium-thicknessseams
1958 A. A. Borisov
Some reserves for increasing labor productivity during preparatory excavations
1958 P. A. Kondrashov
On the methodology for setting ore loss and dilution rates for disseminated ore development
1958 P. I. Gorodetskii, N. Z. Galaev
Dynamic coefficient for the calculation of rigid shaft equipment in mine shafts
1958 T. A. Ponomareva
Influence of trip length on core recovery in different rocks
1958 A. P. Rudenko
Cleaning of flushing solutions during mine shaft drilling
1958 V. V. Smirnyakov