Dynamic coefficient for calculation of rigid reinforcement of mine shafts

Authors:
T. A. Ponomareva
Date submitted:
1957-07-20
Date accepted:
1957-09-21
Date published:
1958-04-26

Abstract

In the practice of mine shaft reinforcement design up to the present time the calculation of reinforcement elements is made according to the norms based on the “Prussian rules for lifting and lowering people” from 6/IV 1925, Thus, in 1934 S. L. Lazovsky drew attention to the fact that due to the elasticity of conductors the load is distributed unevenly between the shoots and gave a solution to the problem of load distribution between the shoots taking into account the elasticity of conductors.

Область исследования:
(Archived) Without section
Go to volume 36

References

  1. Bernstein S. A. Fundamentals of Dynamics of Structures. Stroyizdat, 1941.
  2. Dyakonov N. N. Investigation of the system rigid conductors - shootings in connection with the action of mine parachutes. Cand. dissertation. V. I. Lenin Library, 1950.
  3. Dyakonov N. N. About distribution of load between conductors and shoots of a mine shaft at catching of cages by parachutes. Proceedings of the Central Asian Polytechnic Institute, Gosizdat UzSSR, 1955.
  4. Dobrokhotov A. A. Work of reinforcement of vertical shafts of mines. Cand. dissertation. V. I. Lenin Library, 1953.
  5. Dobrokhotov A. A. About calculation of rigid reinforcement of shafts of mines. Coll.: Problems of Mining Excavations, Ugletekhizdat, 1955.
  6. Lazovskiy S. L. To a question about calculation of shoots. Mining Journal 1934, No. 8.
  7. Medvedev L. G. Some questions of work of reinforcement of mine shafts, cand. dissertation. V. I. Lenin Library, 1953.
  8. ShuLMIn, I. M. and Mishchenko, N. V. To the question of distribution of efforts between shootings. Labor safety in the mining industry, 1936, No. 10.
  9. ShuLMIn I. M. and Mishchenko N. V. To the issue of calculation of shaft shootings of mines. Mining Journal, 1937, No. 1, 2.
  10. Badura S. Mining Review, 1955, No. 5 (688).

Similar articles

Some reserves for increasing labor productivity during preparatory excavations
1958 P. A. Kondrashov
Refinement of the methodology for determining the boundaries of open pit operations for specific design purposes
1958 D. F. Borisov
On the methodology for setting ore loss and dilution rates for disseminated ore development
1958 P. I. Gorodetskii, N. Z. Galaev
Increase of intensity of development of copper and cobalt ore bodies at layer caving
1958 N. P. Volkh
Alexander M. Alamsky (1900-1957)
1958 P. I. Mustel
Unresolved issues of mine shaft drilling
1958 K. V. Koshelev