Submit an Article
Become a reviewer
Vol 49 Iss. 1
Pages:
95-98
Download volume:
RUS
Article

About optimum parameters of hydraulic works at placer deposits

Authors:
G. M. Lezgintsev
Date submitted:
1963-07-30
Date accepted:
1963-09-05
Date published:
1964-10-31

Abstract

As is known, the hydraulic method of development provides a comprehensive mechanization of labor and high technical and economic performance. As applied to the development of alluvial deposits, one of the urgent tasks is the determination of design parameters and improvement of hydraulic mining systems.Specific water consumption in short-season hydraulics with natural head depends both on the natural conditions of each particular placer (physical and mechanical properties of the soil, the thickness and width of the placer, the slope and nature of the dam, etc.) and on factors related to the organization of placer mining (head and water quantity, mining system, adopted equipment, the length of the excavation area, etc.).

Область исследования:
Mining
Go to volume 49

References

  1. Shorokhov S. M., Khnykin V. F. Theoretical bases of head selection at hydraulic developments with a water intake ditch. Kolyma, 1957, No. 9.
  2. Collection of Standardized Norms of Work and Time for Placer Mining by Hydraulic Method. Gosgortechnichesdat, 1961.

Similar articles

Use of volume growth charts in the design and planning of mining operations at open-pit mines
1964 N. D. Semenov, I. M. Norkin, V. D. Smelov
Model study of strength and stability of inter-chamber concrete piers
1964 Yu. I. Panenkov
Calculation of concrete piers-walls for strength and stability
1964 V. N. Semevskii, Yu. I. Panenkov, M. P. Markovich
Operation of deep ore dumps at Apatite open pits in the Polar Region
1964 A. A. Kuleshov
On the influence of the degree of loosening on ore release under caving rocks
1964 N. Z. Galaev, M. I. Shiman
Mode of ore release from uprising branched stores
1964 E. I. Boguslavskii