Use of cumulative volume graphs in the design and planning of mining operations at open-pit mines

Authors:
N. D. Semenov
I. M. Norkin
V. D. Smelov
Date submitted:
1963-07-25
Date accepted:
1963-09-13
Date published:
1964-10-31

Abstract

In the development of any deposit, numerous variants of development systems are possible according to the order of development of the working face in the open pit. The final evaluation of the variants with the choice of the most economical one is carried out according to the standard methodology.

Область исследования:
Mining
Funding:

None

Go to volume 49

References

  1. Typical methodology for determining the economic efficiency of capital investments and new equipment in the national economy of the USSR. Gosplanizdat, 1960.
  2. Rzhevskiy V. V. The use of electronic computing machines for calculating the volume of open-pit mining operations. Gornyi zhurnal, 1963, No. 10.
  3. Zolotarev N. D. Methodology of Determination of Quarry Boundaries and Annual Overburden Volumes on the Basis of Design Experience. Zapiski Gornogo Instituta, vol. XLIV, iss. 1, 1961.

Similar articles

Development of calculation methods for rock transfer beyond the pit contour
1964 I. M. Norkin
Method of the estimation of rock fracturing
1964 V. A. Padukov
Industrial studies of mining systems at the Zapolyarny Mine of the Norilsk Combine
1964 A. I. Shablygin
Basic dependencies in the development of the working face at open pits, prone to landslides
1964 N. D. Zolotarev
On optimum parameters of hydraulic mining at placer deposits
1964 G. M. Lezgintsev
Sustainability heterogeneous heterogeneous goals
1964 V. G. Bezkaravainyi