Submit an Article
Become a reviewer
Vol 49 Iss. 1
Pages:
80-84
Download volume:
RUS
Article

Development of calculation methods for rock transfer beyond the pit contour

Authors:
I. M. Norkin
Date submitted:
1963-07-22
Date accepted:
1963-09-03
Date published:
1964-10-31

Abstract

The development of calculation methods for rock transfer beyond the contour of the open pit is associated with the design of the development of a group of bauxite deposits and further work on the definition and implementation of rational parameters of mining operations for rock transfer by walking draglines. Usual design calculations are carried out on many cross-sections with drawing of each drift. The labor intensity of this method is high, and the accuracy, depending on the distance between adjacent cross sections, is low, because the number of sections to speed up calculations is limited to.

Область исследования:
Mining
Go to volume 49

References

  1. Zolotarev N. D. Displacement of waste rocks into dumps during the development of ore deposits. Mining Journal, 1948, No. 9.
  2. Zolotarev N. D., Sigachev A. E. Features of development and calculations of quarry elements at rock transfer into external dumps. Izv. vuzov. Mining Journal, 1959, No. 7.
  3. Zolotarev N. D. Development of mining engineering measures to ensure stability of pit slopes in conditions of Tikhvin bauxite deposits. Funds of LMI, 1958; 1959.
  4. Zolotarev N. D., Norkin I.M. Development of recommendations on dewatering of open pits and determination of parameters of mining operations at walking and rotary excavators in conditions of Tikhvin bauxite deposits. Funds of LMI, 1961.

Similar articles

Use of volume growth charts in the design and planning of mining operations at open-pit mines
1964 N. D. Semenov, I. M. Norkin, V. D. Smelov
Problems of effective development of complex fat forms
1964 A. I. Shablygin, V. G. Eliseev, E. I. Boguslavskii
Mode of ore release from uprising branched stores
1964 E. I. Boguslavskii
Sustainability heterogeneous heterogeneous goals
1964 V. G. Bezkaravainyi
Model study of strength and stability of inter-chamber concrete piers
1964 Yu. I. Panenkov
Mining pressure management at the Zapolyarny mine of the Norilsk Combine
1964 N. Z. Galaev, A. V. Isaev