Sustainability heterogeneous heterogeneous goals

Authors:
V. G. Bezkaravainyi
Date submitted:
1963-07-18
Date accepted:
1963-09-21
Date published:
1964-10-31

Abstract

In the mines of the Baltic oil shale basin, extensive industrial tests of different variants of the chamber mining system have been carried out for several years. In order to correctly determine the parameters of the system, the behavior of rock pressure was studied at the mine No. 3 of the Slantsy Combine, in particular, the stability of the pillars was investigated. The commercial oil shale bed with a total thickness of 2–3 m is almost horizontal at a depth of 30–100 m under the conditions of the basin and consists of four layers of oil shale and three rock partings. In the roof and floor of the seam, limestones are interbedded with clay and oil shale.

Область исследования:
Mining
Funding:

None

Go to volume 49

Similar articles

Model study of strength and stability of inter-chamber concrete pillars
1964 Yu. I. Panenkov
Industrial studies of mining systems at the Zapolyarny Mine of the Norilsk Combine
1964 A. I. Shablygin
Inclined boreholes as a means of leveling the base of the bench at granite quarries
1964 A. B. Fadeev, A. E. Sigachev
Development of calculation methods for rock transfer beyond the pit contour
1964 I. M. Norkin
Mode of ore drawing from uprising branched up‑dip stopes
1964 E. I. Boguslavskii
Method of the estimation of rock fracturing
1964 V. A. Padukov