Submit an Article
Become a reviewer
Vol 63 Iss. 1
Pages:
46-50
Download volume:
RUS
Article

Determination of ore pit productivity reserve

Authors:
O. V. Shpansky
Date submitted:
1971-07-03
Date accepted:
1971-09-08
Date published:
1972-07-07

Abstract

Correctly chosen productivity of the open pit on mineral resources has always been the key to sustainable and economical operation of the mining enterprise. And the more complex the geological structure of the deposit, the more difficult the task of determining the productivity. Apatit's Koashvinskoye apatite-nepheline deposit is a very complex one. It is represented by four ore bodies with a configuration characterized in plan view and at depth by frequent swellings and overhangs.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 63

References

  1. Arsentiev A. I. Determination of Productivity and Boundaries of Quarries. 2nd ed. Nedra, 1970.
  2. Arsentyev A. I., Kvitka V. V. Influence of Reliability of Balance Reserves on the Production Capacity of the Quarry. In the collection: Problems of Work of Quarries of the North. PH LMI, 1968.
  3. Levin L. V. Consideration of the reliability of reserves in determining the productivity of quarries. In the collection: Work of Quarries in Difficult Conditions. Nauka, 1967.

Similar articles

Blasted rock mass stockpile management at a quarry
1972 K. I. Kataya, N. P. Ershov, A. F. Bogachev, V. V. Plekhov
Planning of excavator productivity in the Polar region conditions
1972 B. A. Egin
Speed of deepening of an open pit at application of draglines
1972 V. P. Linev
Influence of landslides on the productivity of mining transportation equipment
1972 S. G. Khristov
Development of low-power shale beds by mounted rippers
1972 N. N. Timofeev
Dynamics of drilling works volumes at the quarries of the Polar region
1972 A. E. Sigachev, M. M. Zemdega