Determination of open pit boundaries is one of the main tasks of designing the field development. Its solution is usually carried out in three stages. The boundary stripping ratio is calculated, then the method of delineation is selected, and, finally, according to the selected method, the quarry is delineated.

Область исследования:
(Archived) Without section
Go to volume 63

Similar articles

Clarification of the boundary stripping ratio in the development of complex ores
1972 L. F. Sannikova
Dynamics of drilling works volumes at the quarries of the Polar region
1972 A. E. Sigachev, M. M. Zemdega
Determination of ore pit productivity reserve
1972 O. V. Shpansky
Statistical analysis of working area width
1972 A. F. Bogachev, D. I. Shitov
Planning of excavator productivity in the Polar region conditions
1972 B. A. Egin
Estimation of the uniformity of mining transportation equipment operation in the quarries of the Polar Region
1972 A. V. Zhukov