Determination of open pit boundaries by the method of using the acceptable average stripping ratio

Authors:
O. V. Shpansky
A. A. Kovpak
Date submitted:
1971-07-29
Date accepted:
1971-09-21
Date published:
1972-07-07

Abstract

Determination of open pit boundaries is one of the main tasks of designing the field development. Its solution is usually carried out in three stages. The boundary stripping ratio is calculated, then the method of delineation is selected, and, finally, according to the selected method, the quarry is delineated.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 63

Similar articles

Influence of landslides on the productivity of mining transportation equipment
1972 S. G. Khristov
Analysis of seasonal fluctuations of rock and ore extraction in the Polar Region quarries
1972 A. E. Sigachev
Criterion for estimating the intensity of construction and development of quarry productivity
1972 S. B. Rubinshtein, V. P. Linev
Statistical analysis of working area width
1972 A. F. Bogachev, D. I. Shitov
Clarification of the boundary stripping ratio in the development of complex ores
1972 L. F. Sannikova
Development of low-power shale beds by mounted rippers
1972 N. N. Timofeev