Determination of open pit boundaries by the method of using the acceptable average stripping ratio

Authors:
O. V. Shpansky
A. A. Kovpak
Date submitted:
1971-07-29
Date accepted:
1971-09-21
Date published:
1972-07-07

Abstract

Determination of open pit boundaries is one of the main tasks of designing the field development. Its solution is usually carried out in three stages. The boundary stripping ratio is calculated, then the method of delineation is selected, and, finally, according to the selected method, the quarry is delineated.

Область исследования:
(Archived) Without section
Go to volume 63

Similar articles

Planning of excavator productivity in the Polar region conditions
1972 B. A. Egin
Contribution of scientists of St. Petersburg-Leningrad Mining Institute to the development of open pit mining (to the 200th anniversary of the Leningrad Mining Institute)
1972 A. I. Arsentiev, G. S. Mikhailov
Selection of the direction of mining development in unstable rocks
1972 S. G. Khristov
On efficiency of averaging stacks operation
1972 E. I. Azbel, A. I. Shein
Optimality problem in air exchange control in quarries
1972 Yu. V. Gul
Interrelations of velocities in mining development (volumetric problem)
1972 G. P. Konstantinov