Submit an Article
Become a reviewer
Vol 63 Iss. 1
Pages:
20-23
Download volume:
RUS
Article

Estimation of the uniformity of mining transportation equipment operation in the quarries of the Polar Region

Authors:
A. V. Zhukov
Date submitted:
1971-07-04
Date accepted:
1971-09-01
Date published:
1972-07-07

Abstract

Uneven operation allows to eliminate equipment downtime, eliminate violations of technological discipline and eliminate unproductive costs associated with deviations from the normal course of production. Unevenness of the production process of pvda extraction may not create negative consequences for other related technological processes, if this unevenness is provided. But arising in the technological process disproportions can not always be provided in advance plan and to prevent them, should create appropriate reserves (damping devices, accumulating capacity).

Область исследования:
(Archived) Without section
Go to volume 63

References

  1. Adamov V. E. Statistical Study of the Rhythmicity of Industrial Production. Statistics, 1965.
  2. Astakhov A. S. Modes of Work of Mines. Gosgortekhizdat, 1962.
  3. Kababiansky Kh. S. Basic Issues of Mining Statistics. Uglegrotekhizdat, 1953.
  4. Minervin G. V. To the issue of assessing the rhythmicity of the enterprise's work. In the collection: Statistics and Econometrics. PH Moscow Financial Institute, 1959.

Similar articles

Analysis of seasonal fluctuations of rock and ore extraction in the Polar Region quarries
1972 A. E. Sigachev
Determination of direction and organization of deepening of an open pit at development of ore bodies of complex shape
1972 L. F. Sannikova, A. P. Garkushin
Optimality problem in air exchange control in quarries
1972 Yu. V. Gul
Statistical analysis of working area width
1972 A. F. Bogachev, D. I. Shitov
Determination of ore pit productivity reserve
1972 O. V. Shpansky
Analytical determination of the direction of deepening of a circular pit
1972 L. A. Slutsman