The distribution network of potash mines is characterized by great length and energy intensity. Therefore, the voltage value in remote sections of the network often reaches values unacceptable under GOST. To compensate for voltage losses in the distribution networks of potash mines, the following devices can be used: booster transformers BDT; series capacitors SC; parallel sources of reactive power. …
Protection of UPC longitudinal compensation units from overvoltages during short circuits in the 6 kV network can be implemented by means of a thyristor arrester connected in parallel with the capacitors of UPC. …
Distribution networks of potash mines are characterized by great length of outgoing 6 kV cable lines and high power of consumers, which causes voltage deviations at the terminals of electrical receivers over 10%. Sharply variable loads and frequent starts of high-power electric motors cause large voltage fluctuations. This leads to disruption of the normal operation of mechanisms and premature failure of electric motors.…
The asynchronous drive for mine hoisting systems has been widely used due to the simplicity of the system and low capital costs. However, its control characteristics and economic indicators are low …
The energy indicators - efficiency (η) and power factor (cos φ) - largely determine the choice of a particular variable speed drive system. The efficiency of a cascade can be determined through the power losses in the cascade ...
When an unloaded transformer is switched on through the capacitors of the CPC longitudinal compensation unit, undamped resonant oscillations can occur in the circuit. The frequency of these oscillations is usually 1/3 of the mains frequency (in case of subharmonic resonance) or equal to the mains frequency (in case of voltage ferroresonance). Resonant oscillations are known to be accompanied by a sharp increase in transformer magnetizing current and overvoltages both across the CPC itself and across the transformer ...
The installation of longitudinal compensation (CPC) of voltage losses in the distribution network of the mining site was first tested in production conditions at one of the sites of the Kirov mine of the Slantsy Combine in 1964. In the experimental operation of the CPC, the feasibility and efficiency of automatic voltage regulation by series capacitors in the network of the site were proved. Inclusion of the longitudinal compensation unit allows obtaining a voltage increase at the longwall face distribution point by 20-25% at motor starts and by 10-15% at nominal load ...