Methodology of calculation of modes of CPC with thyristor arrester at short circuits in distribution networks 6 kV

Authors:
O. V. Ivanov
S. A. Maksimov
E. M. Proskuryakov
Date submitted:
1978-08-21
Date accepted:
1978-10-29
Date published:
1979-02-01

Abstract

Protection of longitudinal compensation units of CPC from overvoltages at short-circuits in the network of 6 kV can be implemented by means of thyristor arrester, included in parallel to capacitors of CPC ...

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 84

Similar articles

Ways to increase train traffic safety at automation of electric locomotive pulling
1979 O. B. Lakota, V. N. Kordakov
Calculation of mine traction substations with pulse thyristor converters
1979 E. V. Bannikov, V. P. Stepanenko, L. A. Chubarov
Formation on a physical model of loads statistically equivalent to real ones
1979 B. P. Konovalov
Peculiarities of longitudinal and transverse compensation of voltage and reactive power losses in mine distribution networks
1979 V. M. Kvyatkovsky, E. M. Proskuryakov, L. N. Smirnova, Ya. E. Shklyarsky
Experience of industrial operation of CPC in 6 kV distribution networks of potash mines
1979 O. V. Ivanov, B. P. Konovalov, M. M. Malyushitsky, V. D. Ryzhkov
Criteria of mine electric locomotive control during train moving from a place
1979 V. N. Kordakov