Procedure of Korobkovsky iron-ore deposit new levels mining with the usage of physical modeling has been determined. Evaluation of interchamber pillars fixity in Gubkin mine and soil surface deformation in the process of lift mining and fractional interchamber pillars robbing on three levels has been carried out. After conducting geomechanical research the decision of foremost development and mining of bottom level reserve between –125 m / –250 m has been made.
Technological solutions of ore loss reduction in interchamber pillars at bottom levels design of Gubkin mine are developed. For the purpose of justification of these offers has been carried out: physical (with the use of equivalent materials) and mathematical (finite element method) modeling. The research results and schedules of economic borders of use of new technologies are presented. The requirement for pilot work before industrial scale use is established.
Technological solutions of ore loss reduction in interchamber pillars at bottom levels design of Gubkin mine are developed. Research based on physical (with the use of equivalent materials) and mathematical (finite element method) modelling has been carried out. The requirement for pilot work before industrial scale use is established.
Technological decisions on decrease in losses of ore in between chamber walls are considered at designing of the bottom horizons of mine of Gubkin. It is offered two variants of decrease in losses of the ore technologically compatible with each other for their simultaneous use. Results of calculation of losses of ore and economic consequences are resulted. The basic actions which are necessary for carrying out, before introduction of technological decisions in manufacture are described.