Economic efficiency reducing ore losses in pillars of level-chamber method operational at the Korobkovsky of the iron-ore deposit
About authors
- 1 — National Mineral Resources University (Mining University)
- 2 — National Mineral Resources University (Mining University)
Abstract
Technological solutions of ore loss reduction in interchamber pillars at bottom levels design of Gubkin mine are developed. For the purpose of justification of these offers has been carried out: physical (with the use of equivalent materials) and mathematical (finite element method) modeling. The research results and schedules of economic borders of use of new technologies are presented. The requirement for pilot work before industrial scale use is established.
References
- Богуславский Э.И. Снижение потерь руды в междукамерных целиках при проектировании нижних горизонтов рудника им. Губкина ОАО «Комбинат КМАруда» / Э.И.Богуславский, П.В.Коржавых // Записки Горного института. СПб, 2010. Т.186. С.50-53.
- Литвиненко В.С. Физическое и математическое моделирование технологических параметров этажнокамерной системы разработки нижнего горизонта рудника им. Губкина / В.С.Литвиненко, Э.И.Богуславский, П.В.Коржавых // Записки Горного института. СПб, 2012. Т.195. С.115-119.
- Пат. 2405109 РФ. МКП Е 21 С 41/22. Способ разработки мощных рудных месторождений подземным / Э.И.Богуславский, П.В.Коржавых, И.Э.Богуславский, А.Б.Андреев, И.А.Волик. Опубл. 27.11.2010. Бюл. № 33.
Similar articles
Measures of stimulation of use of associated petroleum gas use
2013 V. P. Skobelina, I. S. Tremasova
Methodical maintenance of calculation parameters of pillars when developing coal-bed dangerous on rockburst
2013 D. V. Sidorov
The interaction of the cluster with the determinantsof competitive advantage petrochemical industry of the Omsk region
2013 M. M. Khaikin, V. S. Kudryashov