Submit an Article
Become a reviewer
Vol 207
Pages:
17-21
Download volume:
RUS
Article

Physical modeling of interchamber pillars fixity in Gubkin mine

Authors:
E. I. Boguslavskiy1
B. Yu. Zuev2
P. V. Korzhavykh3
About authors
  • 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
  • 2 — Ph.D. laboratory head National Mineral Resources University (Mining University)
  • 3 — Ph.D. Assistant lecturer National Mineral Resources University (Mining University)
Date submitted:
2013-07-29
Date accepted:
2013-09-24
Date published:
2014-03-17

Abstract

Procedure of Korobkovsky iron-ore deposit new levels mining with the usage of physical modeling has been determined. Evaluation of interchamber pillars fixity in Gubkin mine and soil surface deformation in the process of lift mining and fractional interchamber pillars robbing on three levels has been carried out. After conducting geomechanical research the decision of foremost development and mining of bottom level reserve between –125 m / –250 m has been made.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
physical modeling equivalent materials procedure of levels mining iron-ore deposits
Funding:

None

Go to volume 207

References

  1. Glushikhin F.P, Kuznetsov G.N., Shklyarskij M.F. and others. Simulation in geomechanics. Moscow: Nedra, 1991. 240 p.
  2. Kuznetsov G.N., Budko M.N., Vasiljev Yu.I. and others. Simulation of mining pressure occurrences. Leningrad: Nedra, 1968. 280 p.

Similar articles

Experience of implementing electromagnetic shielding on OJSC «Mordovcement»
2014 P. S. Sedov, S. V. Kovshov, Z. N. Cherkai
Prospects of improving technology for development of coalseams in Vietnam’s undergroundmines
2014 Kao Kuok Vet, V. P. Zubov
Influence of disjunctive dislocations on parameters of secure zones on flat-lying adjacent coal seams
2014 V. P. Zubov, E. R. Kovalskii, A. V. Nikiforov
Analytical estimation of aerodynamic characteristics of the main roof collapse
2014 V. V. Smirnyakov
Quality management of brown coal at open-pit mine in the presence of several consumers with varios requirements to it
2014 M. M. Yakubovskii, K. Drebenshtedt
Analysis of impact of gas field water bodies
2014 T. A. Petrova