Abstract
Procedure of Korobkovsky iron-ore deposit new levels mining with the usage of physical modeling has been determined. Evaluation of interchamber pillars fixity in Gubkin mine and soil surface deformation in the process of lift mining and fractional interchamber pillars robbing on three levels has been carried out. After conducting geomechanical research the decision of foremost development and mining of bottom level reserve between –125 m / –250 m has been made.
Область исследования:
(Archived) Geotechnology for development of solid mining fields
Funding:
None
References
- Glushikhin F.P, Kuznetsov G.N., Shklyarskij M.F. and others. Simulation in geomechanics. Moscow: Nedra, 1991. 240 p.
- Kuznetsov G.N., Budko M.N., Vasiljev Yu.I. and others. Simulation of mining pressure occurrences. Leningrad: Nedra, 1968. 280 p.
Similar articles
Assessment of the longwall face length influence on gas emission at longwall panels of the OJSC «Vorkutaugol» coal mines
2014 O. I. Kazanin, A. M. Sufiyarov
Quality management of brown coal at open-pit mine in the presence of several consumers with varios requirements to it
2014 M. M. Yakubovskii, K. Drebenshtedt
Experience of implementing electromagnetic shielding on OJSC «Mordovcement»
2014 P. S. Sedov, S. V. Kovshov, Z. N. Cherkai