Physical modeling of interchamber pillars fixity in Gubkin mine
About authors
- 1 — National Mineral Resources University (Mining University)
- 2 — National Mineral Resources University (Mining University)
- 3 — National Mineral Resources University (Mining University)
Abstract
Procedure of Korobkovsky iron-ore deposit new levels mining with the usage of physical modeling has been determined. Evaluation of interchamber pillars fixity in Gubkin mine and soil surface deformation in the process of lift mining and fractional interchamber pillars robbing on three levels has been carried out. After conducting geomechanical research the decision of foremost development and mining of bottom level reserve between –125 m / –250 m has been made.
Similar articles
Mining units quantity determination to achieve the established open cast output and averaging ore requirements
2014 S. I. Fomin, V. A. Shevelev, M. A. Marinin
Experience of implementing electromagnetic shielding on OJSC «Mordovcement»
2014 P. S. Sedov, S. V. Kovshov, Z. N. Cherkai
Increasing efficiency and mine resource development on the Prokopevsk-Kisilevsky deposit
2014 E. A. Kochetkova, A. A. Sidorenko, V. V. Sementsov
Open cast geological conditions analysis and the mining units formation in ore losses and dilution determining
2014 S. I. Fomin, P. B. Kava, M. A. Marinin