Procedure of Korobkovsky iron-ore deposit new levels mining with the usage of physical modeling has been determined. Evaluation of interchamber pillars fixity in Gubkin mine and soil surface deformation in the process of lift mining and fractional interchamber pillars robbing on three levels has been carried out. After conducting geomechanical research the decision of foremost development and mining of bottom level reserve between –125 m / –250 m has been made.
Similar articles
Comparative analysis of methods of waste disposal biological treatment of the fuel and energy complex
2014 A. E. Isakov
Analysis of accident and stages of effective safety management system on the example of «Vorkutaugol»
2014 E. G. Buldakova, E. B. Gridina
Modern technology of consumption waste management in the mining agglomeration
2014 M. Sh. Barkan, A. B. Makhovikov, E. I. Kabanov