Physical modeling of interchamber pillars fixity in Gubkin mine

Authors:
E. I. Boguslavskiy1
B. Yu. Zuev2
P. V. Korzhavykh3
About authors
  • 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
  • 2 — Ph.D. laboratory head National Mineral Resources University (Mining University)
  • 3 — Ph.D. Assistant lecturer National Mineral Resources University (Mining University)
Date submitted:
2013-07-29
Date accepted:
2013-09-24
Date published:
2014-03-17

Abstract

Procedure of Korobkovsky iron-ore deposit new levels mining with the usage of physical modeling has been determined. Evaluation of interchamber pillars fixity in Gubkin mine and soil surface deformation in the process of lift mining and fractional interchamber pillars robbing on three levels has been carried out. After conducting geomechanical research the decision of foremost development and mining of bottom level reserve between –125 m / –250 m has been made.

Keywords:
physical modeling equivalent materials procedure of levels mining iron-ore deposits
Go to volume 207

References

  1. Моделирование в геомеханике / Ф.П.Глушихин, Г.Н.Кузнецов, М.Ф.Шклярский и др. М.: Недра, 1991. 240 с.
  2. Моделирование проявлений горного давления / Г.Н.Кузнецов, М.Н.Будько, Ю.И.Васильев и др. Л.: Недра, 1968. 280 с.

Similar articles

Application of the method of x-ray fluorescence for carrying out monitoring of the soil and vegetable cover
2014 M. A. Kulikova
Quarry capacity of ore relation from bench height
2014 G. A. Kholodnyakov, M. D. Abdullaev
Analysis of impact of gas field water bodies
2014 T. A. Petrova
Justification of effective dust control in the open-pits of cryolithozone
2014 E. P. Dalbaeva
The analysis of the stress-and-strain state in vicinity of mining excavations
2014 A. A. Sankovskii, E. R. Kovalskii
Technology options for the preparation of new horizons
2014 G. A. Kholodnyakov, D. N. Ligotskii