Physical modeling of interchamber pillars fixity in Gubkin mine

Authors:
E. I. Boguslavskii1
B. Yu. Zuev2
P. V. Korzhavykh3
About authors
  • 1 — National Mineral Resources University (Mining University)
  • 2 — National Mineral Resources University (Mining University)
  • 3 — National Mineral Resources University (Mining University)
Date submitted:
2013-07-29
Date accepted:
2013-09-24
Date published:
2014-01-01

Abstract

Procedure of Korobkovsky iron-ore deposit new levels mining with the usage of physical modeling has been determined. Evaluation of interchamber pillars fixity in Gubkin mine and soil surface deformation in the process of lift mining and fractional interchamber pillars robbing on three levels has been carried out. After conducting geomechanical research the decision of foremost development and mining of bottom level reserve between –125 m / –250 m has been made.

Go to volume 207

Similar articles

Open cast geological conditions analysis and the mining units formation in ore losses and dilution determining
2014 S. I. Fomin, P. B. Kava, M. A. Marinin
Technology options for the preparation of new horizons
2014 G. A. Kholodnyakov, D. N. Ligotskii
About the long-range programme for industrial and ecological safety in coal branch of industry
2014 V. V. Smirnyakova
Assessment of the longwall face length influence on gas emission at longwall panels of the OJSC «Vorkutaugol» coal mines
2014 O. I. Kazanin, A. M. Sufiyarov
Occupational safety and health professional
2014 Z. N. Cherkai
Reducing environmental hazard drilling works
2014 M. M. Malyshkin