Physical modeling of interchamber pillars fixity in Gubkin mine
About authors
- 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
- 2 — Ph.D. laboratory head National Mineral Resources University (Mining University)
- 3 — Ph.D. Assistant lecturer National Mineral Resources University (Mining University)
Abstract
Procedure of Korobkovsky iron-ore deposit new levels mining with the usage of physical modeling has been determined. Evaluation of interchamber pillars fixity in Gubkin mine and soil surface deformation in the process of lift mining and fractional interchamber pillars robbing on three levels has been carried out. After conducting geomechanical research the decision of foremost development and mining of bottom level reserve between –125 m / –250 m has been made.
Область исследования:
(Archived) Geotechnology for development of solid mining fields
References
- Glushikhin F.P, Kuznetsov G.N., Shklyarskij M.F. and others. Simulation in geomechanics. Moscow: Nedra, 1991. 240 p.
- Kuznetsov G.N., Budko M.N., Vasiljev Yu.I. and others. Simulation of mining pressure occurrences. Leningrad: Nedra, 1968. 280 p.
Similar articles
Physical processes methane formation as a result of coal disintegration
2014 M. G. Menzhulin, A. V. Montikov, S. V. Vasilev
Parameters of removing the overburden for deposits complex structure of carbonate rocks
2014 V. V. Ivanov
Gas emission control parameters determination for sublevel caving mining systems at the «Kiselevskaya» coal mine
2014 O. I. Kazanin, A. A. Sidorenko, V. V. Sementsov
Identification of degradation of soil and vegetable communities testing technogenic loading on materials of space shooting
2014 D. S. Korelskii