Physical modeling of interchamber pillars fixity in Gubkin mine

Authors:
E. I. Boguslavskiy1
B. Yu. Zuev2
P. V. Korzhavykh3
About authors
  • 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
  • 2 — Ph.D. laboratory head National Mineral Resources University (Mining University)
  • 3 — Ph.D. Assistant lecturer National Mineral Resources University (Mining University)
Date submitted:
2013-07-29
Date accepted:
2013-09-24
Date published:
2014-03-17

Abstract

Procedure of Korobkovsky iron-ore deposit new levels mining with the usage of physical modeling has been determined. Evaluation of interchamber pillars fixity in Gubkin mine and soil surface deformation in the process of lift mining and fractional interchamber pillars robbing on three levels has been carried out. After conducting geomechanical research the decision of foremost development and mining of bottom level reserve between –125 m / –250 m has been made.

Keywords:
physical modeling equivalent materials procedure of levels mining iron-ore deposits
Go to volume 207

References

  1. Моделирование в геомеханике / Ф.П.Глушихин, Г.Н.Кузнецов, М.Ф.Шклярский и др. М.: Недра, 1991. 240 с.
  2. Моделирование проявлений горного давления / Г.Н.Кузнецов, М.Н.Будько, Ю.И.Васильев и др. Л.: Недра, 1968. 280 с.

Similar articles

Analytical estimation of aerodynamic characteristics of the main roof collapse
2014 V. V. Smirnyakov
The analysis of the stress-and-strain state in vicinity of mining excavations
2014 A. A. Sankovskii, E. R. Kovalskii
Research of technogenic migration of manganese in water objects of the Kovdor area
2014 V. A. Petrova, M. A. Pashkevich
Use of coefficient of output at pit delimitation
2014 G. A. Kholodnyakov, N. S. Vainonen
Reducing environmental hazard drilling works
2014 M. M. Malyshkin
Increase of stability of mine workings in the permafrost zone
2014 A. F. Galkin