Submit an Article
Become a reviewer
Vol 207
Pages:
17
Download volume:
RUS

Physical modeling of interchamber pillars fixity in Gubkin mine

Authors:
E. I. Boguslavskii1
B. Yu. Zuev2
P. V. Korzhavykh3
About authors
  • 1 — National Mineral Resources University (Mining University)
  • 2 — National Mineral Resources University (Mining University)
  • 3 — National Mineral Resources University (Mining University)
Date submitted:
2013-07-29
Date accepted:
2013-09-24
Date published:
2014-01-01

Abstract

Procedure of Korobkovsky iron-ore deposit new levels mining with the usage of physical modeling has been determined. Evaluation of interchamber pillars fixity in Gubkin mine and soil surface deformation in the process of lift mining and fractional interchamber pillars robbing on three levels has been carried out. After conducting geomechanical research the decision of foremost development and mining of bottom level reserve between –125 m / –250 m has been made.

Go to volume 207

Similar articles

Production of slate gas
2014 R. D. Magomet
Comparative analysis of methods of waste disposal biological treatment of the fuel and energy complex
2014 A. E. Isakov
Analysis of accident and stages of effective safety management system on the example of «Vorkutaugol»
2014 E. G. Buldakova, E. B. Gridina
Modern technology of consumption waste management in the mining agglomeration
2014 M. Sh. Barkan, A. B. Makhovikov, E. I. Kabanov
Increasing efficiency and mine resource development on the Prokopevsk-Kisilevsky deposit
2014 E. A. Kochetkova, A. A. Sidorenko, V. V. Sementsov
Endogenous fire hazard Kuzbass mines
2014 A. A. Sidorenko