Submit an Article
Become a reviewer
Vol 207
Pages:
17
Download volume:
RUS

Physical modeling of interchamber pillars fixity in Gubkin mine

Authors:
E. I. Boguslavskii1
B. Yu. Zuev2
P. V. Korzhavykh3
About authors
  • 1 — National Mineral Resources University (Mining University)
  • 2 — National Mineral Resources University (Mining University)
  • 3 — National Mineral Resources University (Mining University)
Date submitted:
2013-07-29
Date accepted:
2013-09-24
Date published:
2014-01-01

Abstract

Procedure of Korobkovsky iron-ore deposit new levels mining with the usage of physical modeling has been determined. Evaluation of interchamber pillars fixity in Gubkin mine and soil surface deformation in the process of lift mining and fractional interchamber pillars robbing on three levels has been carried out. After conducting geomechanical research the decision of foremost development and mining of bottom level reserve between –125 m / –250 m has been made.

Go to volume 207

Similar articles

Mining units quantity determination to achieve the established open cast output and averaging ore requirements
2014 S. I. Fomin, V. A. Shevelev, M. A. Marinin
Experience of implementing electromagnetic shielding on OJSC «Mordovcement»
2014 P. S. Sedov, S. V. Kovshov, Z. N. Cherkai
Increasing efficiency and mine resource development on the Prokopevsk-Kisilevsky deposit
2014 E. A. Kochetkova, A. A. Sidorenko, V. V. Sementsov
Open cast geological conditions analysis and the mining units formation in ore losses and dilution determining
2014 S. I. Fomin, P. B. Kava, M. A. Marinin
Influence of personal factors on neadekvatne of action of officials of mines
2014 G. V. Rudenko, I. A. Panchenko, S. V. Khokhlov, O. V. Kostromin
Status and development of mining and enrichment of rare earth metals in Russia
2014 M. N. Andreev