Physical modeling of interchamber pillars fixity in Gubkin mine
About authors
- 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
- 2 — Ph.D. laboratory head National Mineral Resources University (Mining University)
- 3 — Ph.D. Assistant lecturer National Mineral Resources University (Mining University)
Abstract
Procedure of Korobkovsky iron-ore deposit new levels mining with the usage of physical modeling has been determined. Evaluation of interchamber pillars fixity in Gubkin mine and soil surface deformation in the process of lift mining and fractional interchamber pillars robbing on three levels has been carried out. After conducting geomechanical research the decision of foremost development and mining of bottom level reserve between –125 m / –250 m has been made.
References
- Моделирование в геомеханике / Ф.П.Глушихин, Г.Н.Кузнецов, М.Ф.Шклярский и др. М.: Недра, 1991. 240 с.
- Моделирование проявлений горного давления / Г.Н.Кузнецов, М.Н.Будько, Ю.И.Васильев и др. Л.: Недра, 1968. 280 с.
Similar articles
Analytical estimation of aerodynamic characteristics of the main roof collapse
2014 V. V. Smirnyakov
The analysis of the stress-and-strain state in vicinity of mining excavations
2014 A. A. Sankovskii, E. R. Kovalskii