Submit an Article
Become a reviewer
Vol 207
Pages:
17
Download volume:

Physical modeling of interchamber pillars fixity in Gubkin mine

Authors:
E. I. Boguslavskii1
B. Yu. Zuev2
P. V. Korzhavykh3
About authors
  • 1 — National Mineral Resources University (Mining University)
  • 2 — National Mineral Resources University (Mining University)
  • 3 — National Mineral Resources University (Mining University)
Date submitted:
2013-07-29
Date accepted:
2013-09-24
Date published:
2014-01-01

Abstract

Procedure of Korobkovsky iron-ore deposit new levels mining with the usage of physical modeling has been determined. Evaluation of interchamber pillars fixity in Gubkin mine and soil surface deformation in the process of lift mining and fractional interchamber pillars robbing on three levels has been carried out. After conducting geomechanical research the decision of foremost development and mining of bottom level reserve between –125 m / –250 m has been made.

Go to volume 207

Similar articles

Determination of ore reclaiming efficiency on accumulation and bedding stockyards
2014 V. A. Shevelev
Rock mechanics problems decision algorithm for bottom layers of potash salt deposits
2014 O. V. Kovalev, S. P. Mozer, I. Yu. Tkhorikov, A. A. Sankovskii
Quarry capacity of ore relation from bench height
2014 G. A. Kholodnyakov, M. D. Abdullaev
Primary forecast of density-related nonstationarity of cross-section upper part
2014 I. B. Movchan, V. Yu. Asyanina
Application of the method of x-ray fluorescence for carrying out monitoring of the soil and vegetable cover
2014 M. A. Kulikova
Contemporary Problems of salvaging drill cuttings on the Western Siberia oilfields of the final stage of development
2014 V. V. Katsilo