Submit an Article
Become a reviewer
Vol 207
Pages:
17
Download volume:

Physical modeling of interchamber pillars fixity in Gubkin mine

Authors:
E. I. Boguslavskii1
B. Yu. Zuev2
P. V. Korzhavykh3
About authors
  • 1 — National Mineral Resources University (Mining University)
  • 2 — National Mineral Resources University (Mining University)
  • 3 — National Mineral Resources University (Mining University)
Date submitted:
2013-07-29
Date accepted:
2013-09-24
Date published:
2014-01-01

Abstract

Procedure of Korobkovsky iron-ore deposit new levels mining with the usage of physical modeling has been determined. Evaluation of interchamber pillars fixity in Gubkin mine and soil surface deformation in the process of lift mining and fractional interchamber pillars robbing on three levels has been carried out. After conducting geomechanical research the decision of foremost development and mining of bottom level reserve between –125 m / –250 m has been made.

Go to volume 207

Similar articles

Approach to the conduct of monitoring studies in the area of the mineral and raw complex objects using remote sensing
2014 T. A. Petrova
Gas balance definition of working area with face zone isolation
2014 V. V. Smirnyakov
Assessment of the longwall face length influence on gas emission at longwall panels of the OJSC «Vorkutaugol» coal mines
2014 O. I. Kazanin, A. M. Sufiyarov
Forecast stress state of mass when extraction coal reserves under open pit mine in the underground mining Nui Beo (Vietnam)
2014 Nguen Van Kuang
Interchamber pillars partial working off technology at the floor-and-chamber system of development of the korobkovsky deposit of KMA
2014 E. I. Boguslavskii, M. N. Andreev
Justification of effective dust control in the open-pits of cryolithozone
2014 E. P. Dalbaeva