Quarry capacity of ore relation from bench height
About authors
- 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
- 2 — post-graduate student National Mineral Resources University (Mining University)
Abstract
The work evaluated the impact of the bench height on the development of mining operations and quarry capacity of ore. The analysis of the height of the step depends on the area of the ore deposit within the quarry field, as well as the dependence of the length of the scope of work on the angle of the ore body.
Область исследования:
(Archived) Geotechnology for development of solid mining fields
Funding:
None
References
- Arsentyev A.I. Determination of productivity andborders of pits. Мoscow: Nedra, 1970. 283 p.
- Arsentyev A.I. Holodnyakov G.A. Design of miningoperations in the open mining. Мoscow: Nedra, 1994. 336 р.
- Troubetzkoy K.N., Krasnyansky G.L., Hronin V.V.Design quarry: 2 vols. Мoscow: Publ. house of the Academy of Mining Sciences, 2001. Vol.2. 519 p.
Similar articles
Physical processes methane formation as a result of coal disintegration
2014 M. G. Menzhulin, A. V. Montikov, S. V. Vasilev
Identification of degradation of soil and vegetable communities testing technogenic loading on materials of space shooting
2014 D. S. Korelskii
Parameters of removing the overburden for deposits complex structure of carbonate rocks
2014 V. V. Ivanov
Influence of personal factors on neadekvatne of action of officials of mines
2014 G. V. Rudenko, I. A. Panchenko, S. V. Khokhlov, O. V. Kostromin