Submit an Article
Become a reviewer

Search articles for by keywords:
wellbore cleaning

Geotechnical Engineering and Engineering Geology
  • Date submitted
    2024-03-20
  • Date accepted
    2024-11-07
  • Date published
    2025-02-27

Analysis of the stress state of rocks transformation near a horizontal well during acid treatment based on numerical simulation

Article preview

The article presents an overview of the assessment and modelling of the stress state of rocks in the near-wellbore zone of horizontal wells during acid stimulation of the formation for improving the efficiency of oil and gas field development. A numerical finite element model of near-wellbore zone of the reservoir drilled by a horizontal section was compiled using one of oil fields in the Perm Territory as an example. The distribution of physical and mechanical properties of the terrigenous reservoir near the well was determined considering transformation under the action of mud acid for different time periods of its injection. Multivariate numerical simulation was performed and the distribution of horizontal and vertical stresses in near-wellbore zone was determined with regard for different values ​​of pressure drawdown and changes in stress-strain properties depending on the area of ​​mud acid infiltration. It was found that a change in elastic modulus and Poisson's ratio under the influence of acid led to a decrease in stresses in near-wellbore zone. Analysis of the stress distribution field based on the Coulomb – Mohr criterion showed that the minimum safety factor of rock even after the effect of mud acid was 1.5; thus, under the considered conditions of horizontal well modelling, the reservoir rock remained stable, and no zones of rock destruction appeared.

How to cite: Popov S.N., Chernyshov S.E., Wang X. Analysis of the stress state of rocks transformation near a horizontal well during acid treatment based on numerical simulation // Journal of Mining Institute. 2025. p. EDN VOBTXU
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2022-10-30
  • Date accepted
    2023-09-20
  • Date published
    2024-02-29

Combined method of phytoremediation and electrical treatment for cleaning contaminated areas of the oil complex

Article preview

The scale of land pollution with oil waste necessitates the use of economical and effective methods of recultivation. Phytoremediation is one of the simplest methods, but it has a number of limitations, so additional preparation of the territory is often required before it is carried out. Preliminary electrical preparation and subsequent seeding of special phytoremediants are of interest. Passing a constant electric current through the soil volume under a low voltage removes toxicants from deep soil layers even with flooding. In addition, it reduces pollutant content in the upper layer, where the plants root system is located, which creates more favorable conditions for phytoremediants. Adequately selected types of plants will ensure additional soil cleaning, improve its structure and air exchange. The results of two research directions are presented. Experiments on the study of plant resistance to oil-contaminated soil substrate allowed establishing contamination thresholds at which it is advisable to sow a particular species, and to choose optimal phytoremediants. The study of the oil-containing soil cleaning in a monocathodocentric electrochemical installation with the fixation of main characteristics (oil products concentration, soil temperature, volt-ampere characteristics) allows us to develop technical measures to prepare territories for phytoremediation taking into account the relief features.

How to cite: Shulaev N.S., Kadyrov R.R., Pryanichnikova V.V. Combined method of phytoremediation and electrical treatment for cleaning contaminated areas of the oil complex // Journal of Mining Institute. 2024. Vol. 265 . p. 147-155. EDN WJRQDO
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2022-08-10
  • Date accepted
    2023-02-28
  • Date published
    2024-02-29

Selection of the required number of circulating subs in a special assembly and investigation of their performance during drilling of radial branching channels by sectional positive displacement motors

Article preview

The task of sludge removal to the surface during construction of directional and horizontal wells and strongly curved radial channels is relevant. For stable operation of technical system “Perfobore”, it is proposed to use a circulating sub that ensures efficient cleaning of channel wellbore from the drilled rock. Two schemes of technical system “Perfobore” are considered, consisting of two seven-meter coiled tubing, a positive displacement motor, a bit and one circulating sub in the first scheme and two subs in the second scheme. For each of the schemes CFD modeling was implemented to determine values of pressure and speed. It was found out that the use of two circulating subs in the assembly is more efficient. In order to confirm the numerical experiment, bench tests were carried out. It was determined that the designed circulating sub can eject up to 25 % of pumped drilling fluid. The bench tests of full-size technical system “Perfobore” for drilling 14-meter channels with two circulating subs showed that the axial load on positive displacement motor produced by hydraulic loader was 3000 N and pressure drop depending on flow rate was 1.5-2.0 MPa. This allows the motor to operate at maximum power.

How to cite: Lyagov I.А., Lyagov A.V., Isangulov D.R., Lyagova А.А. Selection of the required number of circulating subs in a special assembly and investigation of their performance during drilling of radial branching channels by sectional positive displacement motors // Journal of Mining Institute. 2024. Vol. 265 . p. 78-86. EDN ZBPWKU
Modern Trends in Hydrocarbon Resources Development
  • Date submitted
    2022-05-26
  • Date accepted
    2022-11-17
  • Date published
    2022-12-29

Renovation method of restoring well productivity using wavefields

Article preview

A stagewise theoretical substantiation of the renovation vibrowave method of influencing the near-wellbore zone of reservoir for restoring well productivity is presented. The area of treatment by the proposed method covers the reservoir with a heterogeneous permeability with fractures formed by fracking. In this method a decrease in concentration of colmatants occurs due to a change in direction of contaminants migration. Under the influence of pressure pulses, they move deep into the reservoir and disperse through the proppant pack. The results of mathematical modelling of the propagation of pressure wave and velocity wave and the calculations of particles entrainment in wave motion are presented.

How to cite: Shatalova N.V., Apasov T.K., Shatalov A.V., Grigoriev B.V. Renovation method of restoring well productivity using wavefields // Journal of Mining Institute. 2022. Vol. 258 . p. 986-997. DOI: 10.31897/PMI.2022.108
Oil and gas
  • Date submitted
    2018-11-09
  • Date accepted
    2019-01-22
  • Date published
    2019-04-23

Determining the stability of the borehole walls at drilling intervals of loosely coupled rocks considering zenith angle

Article preview

During development of drilling projects, a whole array of data is needed considering the properties of rocks and the conditions of their bedding. Accounting for geomechanical processes occurring in the near-wellbore zone allows avoiding many complications associated with the violation of the wellbore walls stability at all stages of its construction and operation. Technological and technical factors such as vibration and rotation of the drilling string, formation of launders during the descent and ascent of the assembly, pressure pulsation during the start and stop of pumps, hydrostatic and hydrodynamic pressure of the drilling fluid, its composition and properties, have a great influence on the stress-strain state of the medium opened by the well. The washing fluid circulating in the well should provide backpressure to the reservoir, not interact with the rocks chemically, colmatage channels in porous and fractured rocks, preventing penetration of the mud into the medium, by creating an impermeable barrier at drilling clay seams that are prone to swelling, cracking, etc. The article discusses the method for determining the stability of the directed well walls, taking into account the penetration of drilling mud into the pores and fractures of rocks. The technique will allow adjusting the zenith angle of the well during the workout of an unstable interval at the design stage, or selecting a drilling fluid composition to ensure fail-safe drilling.

How to cite: Blinov P.A. Determining the stability of the borehole walls at drilling intervals of loosely coupled rocks considering zenith angle // Journal of Mining Institute. 2019. Vol. 236 . p. 172-179. DOI: 10.31897/PMI.2019.2.172