Submit an Article
Become a reviewer
Vol 148 Iss. 2
Pages:
99-103
Download volume:
RUS
Article

Justification of rational arrangement of the grid of rupture holes formed during explosive fracture to improve the quality of the pelletizing process based on the superposition of dynamic stress in two-dimensional space

Authors:
A. G. Fedorov
About authors
  • Institute for Integrated Subsoil Development, RAS
Date submitted:
2000-07-18
Date accepted:
2000-08-22
Date published:
2001-02-01

Abstract

Currently, a rectangular (square) grid of boreholes is used in iron ore pits, which in technical terms seems most appropriate due to the simplicity of creating, maintaining and accounting for blasting wells and short-delayed blasting (SDF) schemes. The drilling of blocks with a rectangular grid of wells also provides the possibility of a greater choice of groups and schemes of BHA. However, a comprehensive study of the action of blasting in rocks has shown that with a rectangular grid of wells the efficiency of explosive energy is far from optimal, as evidenced by a fairly large yield of oversize (5-10%) and the huge unevenness of the blast block, requiring additional costs of effort, money and time.

Область исследования:
(Archived) Without section
Go to volume 148

Similar articles

Experimental studies on ice cutting
2001 N. I. Vasilev, V. M. Zubkov
Technology of explosive demolition of an industrial high-rise building with a metal bearing frame
2001 P. A. Filippov, A. P. Gaidin, I. V. Mashukov, L. M. Tsinker
Problems of environmental safety monitoring at blasting sites
2001 N. N. Aleinikov, N. N. Vershinin, K. K. Shvedov
Fundamentals of Aseptic Baring of Subglacial Lake Vostok
2001 B. B. Kudryashov, A. N. Dmitriev, N. I. Vasilev
Calculation of rational parameters of fracture of frozen soils during the construction of excavations of given dimensions
2001 I. I. Drozd
Electro-pulse method of rock fracturing and drilling wells
2001 D. V. Zhgun, V. F. Vazhov, M. Yu. Zhurkov