Submit an Article
Become a reviewer
Vol 148 Iss. 2
Pages:
58-62
Download volume:
RUS
Article

Priority areas for the development of the coal, ore and construction oil mining industry by open pit mining to improve blasting methods

Authors:
B. N. Kutuzov
About authors
  • Moscow Mining University
Date submitted:
2000-07-09
Date accepted:
2000-08-28
Date published:
2001-12-21

Abstract

The limited financial capabilities of the mining machine-building industry require identifying the most important priority areas, the solution of which will make it possible to achieve technical progress in improving the productivity of drilling equipment and machinery, creating new explosives and technologies for their use, producing new means of initiation, significantly increasing the effectiveness of blasting preparation of rock for excavation and processing.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 148

Similar articles

Development of an effective method of dust suppression for mass explosions in mining pits
2001 G. G. Karkashadze, I. V. Novikov
Fracture energy capacity as a criterion for stability of building clay backfill
2001 L. K. Gorshkov, S. V. Naumov
Determination of strength and abrasiveness of rocks by the spectrum of acoustic noise during drilling and cutting
2001 A. G. Arkhipov
Damping plate parts test of the moving cover
2001 E. B. Shevkun, N. A. Leonenko
Influence of explosion energy on the quality of rough diamonds
2001 A. T. Vedin, V. Ya. Konovalenko
Energy balance of rock fracture and contact problems of exploratory drilling
2001 L. K. Gorshkov, B. G. Tarasov, N. I. Nikolaev