Priority areas for the development of the coal, ore and construction oil mining industry by open pit mining to improve blasting methods

Authors:
B. N. Kutuzov
About authors
  • Moscow Mining University
Date submitted:
2000-07-09
Date accepted:
2000-08-28
Date published:
2001-12-21

Abstract

The limited financial capabilities of the mining machine-building industry require identifying the most important priority areas, the solution of which will make it possible to achieve technical progress in improving the productivity of drilling equipment and machinery, creating new explosives and technologies for their use, producing new means of initiation, significantly increasing the effectiveness of blasting preparation of rock for excavation and processing.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 148

Similar articles

Perspectives for intensification of operation of mining pits on the basis of environmental safety requirements
2001 A. S. Derzhavets, V. I. Romanov, O. I. Khokhlov
Model of the granulometric composition of the fractured mined rock at the edge
2001 M. G. Menzhulin, G. P. Paramonov, S. V. Khokhlov
Calculation of rational parameters of fracture of frozen soils during the construction of excavations of given dimensions
2001 I. I. Drozd
Theoretical basis of an express method of explosive fracture assessment based on seismic signal parameters
2001 S. V. Lukichev
Experimental simulation of the penetration of chemically active aerosol into destructible material
2001 S. D. Viktorov, N. G. Demchenko, A. P. Kuznetsov
Calculation of the main parameters of drilling and blasting operations in the explosion of selective detonating explosive charges
2001 ZH. G. Dambaev, A. V. Zditovetskii, V. N. Kovalevskii