Priority areas for the development of the coal, ore and construction oil mining industry by open pit mining to improve blasting methods
Authors:
About authors
- Moscow Mining University
Abstract
The limited financial capabilities of the mining machine-building industry require identifying the most important priority areas, the solution of which will make it possible to achieve technical progress in improving the productivity of drilling equipment and machinery, creating new explosives and technologies for their use, producing new means of initiation, significantly increasing the effectiveness of blasting preparation of rock for excavation and processing.
Область исследования:
(Archived) Without section
Funding:
None
Similar articles
Issues of fracture research in drilling explosive boreholes
2001 R. I. Sukhov, Yu. M. Lebedkin, A. V. Tymchur
Principle of database construction for the expert system of seismic safety of blasting operations
2001 V. A. Belin, D. K. Potresov, A. D. Lvov
Development of water-towering way of breaking wells in drilling and blasting operations at mining open pits
2001 G. G. Karkashadze, N. O. Taran