Submit an Article
Become a reviewer
Vol 148 No 2
Pages:
97-98
Download volume:
RUS
Research article
Without section

Technology of explosive demolition of an industrial high-rise building with a metal bearing frame

Authors:
P. A. Filippov1
A. P. Gaidin2
I. V. Mashukov3
L. M. Tsinker4
About authors
  • 1 — OAO Sheregeshskoye RU
  • 2 — OAO Sheregeshskoye RU
  • 3 — OAO VOSTNIGRI
  • 4 — OAO VOSTNIGRI
Date submitted:
2000-07-13
Date accepted:
2000-08-01
Date published:
2001-02-01

Abstract

At many enterprises, depreciation and amortization of buildings and structures significantly exceeds the standard terms. After the commissioning of new facilities, the old ones are closed, their repair and maintenance are stopped. Buildings fall into an emergency condition with spontaneous collapse of walls and elements of building structures with the possible accidental presence of people in the danger zone. Responsibility for the occurrence and consequences of a hazardous situation is borne by the company in charge of the facility. In order to eliminate the hazardous situation, it is necessary to carry out measures to eliminate the emergency facilities.

Go to volume 148

Similar articles

Thermal processes of rock fracture during course mechanical core drilling
2001 G. S. Brodov
Justification of rational arrangement of the grid of rupture holes formed during explosive fracture to improve the quality of the pelletizing process based on the superposition of dynamic stress in two-dimensional space
2001 A. G. Fedorov
Experimental studies on ice cutting
2001 N. I. Vasilev, V. M. Zubkov
Issues of fracture research in drilling explosive boreholes
2001 R. I. Sukhov, Yu. M. Lebedkin, A. V. Tymchur
Development of rational constructions of vertical concentrated explosive charges for mass destruction of ore
2001 A. A. Eremenko, I. V. Mashukov, S. F. Fefelov
Theoretical fundamentals of ice drilling using a relief slot
2001 A. M. Shkurko