Article

Development of water-towering way of breaking wells in drilling and blasting operations at mining open pits

Authors:
G. G. Karkashadze1
N. O. Taran2
About authors
  • 1 — Moscow Mining University
  • 2 — Moscow Mining University
Date submitted:
2000-07-08
Date accepted:
2000-08-11
Date published:
2001-12-21

Abstract

The water cut of working benches in ore pits does not allow the wide use of the simplest types of explosives and causes the necessity of using water-resistant explosives, which significantly increases the cost of blasting operations. In cases when granulotols are used in watered boreholes, there is a very significant environmental load due to increased toxicity of explosion products and high dust-forming ability.

Область исследования:
(Archived) Without section
Go to volume 148

Similar articles

Improvement of blasting operations at quarries in the south of Kuzbass
2001 I. V. Timoshin, A. V. Zykov
Experimental studies on ice cutting
2001 N. I. Vasilev, V. M. Zubkov
Damping plate parts test of the moving cover
2001 E. B. Shevkun, N. A. Leonenko
Assessment of the level of acoustic effect from an open pit explosion
2001 M. G. Egorov, V. A. Artemov, V. A. Mikhailov
Model of the granulometric composition of the fractured mined rock at the edge
2001 M. G. Menzhulin, G. P. Paramonov, S. V. Khokhlov
Investigation of fracture processes of composites with hybrid spatially reinforced weighting material
2001 G. E. Freger, V. P. Tatsienko, V. M. Buchatskii