Development of water-towering way of breaking wells in drilling and blasting operations at mining open pits

Authors:
G. G. Karkashadze1
N. O. Taran2
About authors
  • 1 — Moscow Mining University
  • 2 — Moscow Mining University
Date submitted:
2000-07-08
Date accepted:
2000-08-11
Date published:
2001-12-21

Abstract

The water cut of working benches in ore pits does not allow the wide use of the simplest types of explosives and causes the necessity of using water-resistant explosives, which significantly increases the cost of blasting operations. In cases when granulotols are used in watered boreholes, there is a very significant environmental load due to increased toxicity of explosion products and high dust-forming ability.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 148

Similar articles

Calculation of rational parameters of fracture of frozen soils during the construction of excavations of given dimensions
2001 I. I. Drozd
Environmental issues in building materials extraction
2001 Yu. V. Shuvalov, A. L. Gubenko, A. P. Bulbashev
Theoretical basis of an express method of explosive fracture assessment based on seismic signal parameters
2001 S. V. Lukichev
Technology of explosive demolition of an industrial high-rise building with a metal bearing frame
2001 P. A. Filippov, A. P. Gaidin, I. V. Mashukov, L. M. Tsinker
Perspectives for intensification of operation of mining pits on the basis of environmental safety requirements
2001 A. S. Derzhavets, V. I. Romanov, O. I. Khokhlov
Priority areas for the development of the coal, ore and construction oil mining industry by open pit mining to improve blasting methods
2001 B. N. Kutuzov