Development of water-towering way of breaking wells in drilling and blasting operations at mining open pits
About authors
- 1 — Moscow Mining University
- 2 — Moscow Mining University
Abstract
The water cut of working benches in ore pits does not allow the wide use of the simplest types of explosives and causes the necessity of using water-resistant explosives, which significantly increases the cost of blasting operations. In cases when granulotols are used in watered boreholes, there is a very significant environmental load due to increased toxicity of explosion products and high dust-forming ability.
Область исследования:
(Archived) Without section
Funding:
None
Similar articles
Electro-pulse method of rock fracturing and drilling wells
2001 D. V. Zhgun, V. F. Vazhov, M. Yu. Zhurkov
Fracture energy capacity as a criterion for stability of building clay backfill
2001 L. K. Gorshkov, S. V. Naumov
Development of devices in the modernized technology of drilling and blasting operations for joint mining of ore and ornamental granite in the contours of a common pit
2001 S. K. Rubtsov
Development of an effective method of dust suppression for mass explosions in mining pits
2001 G. G. Karkashadze, I. V. Novikov