Development of water-towering way of breaking wells in drilling and blasting operations at mining open pits
About authors
- 1 — Moscow Mining University
- 2 — Moscow Mining University
Abstract
The water cut of working benches in ore pits does not allow the wide use of the simplest types of explosives and causes the necessity of using water-resistant explosives, which significantly increases the cost of blasting operations. In cases when granulotols are used in watered boreholes, there is a very significant environmental load due to increased toxicity of explosion products and high dust-forming ability.
Область исследования:
(Archived) Without section
Funding:
None
Similar articles
Priority areas for the development of the coal, ore and construction oil mining industry by open pit mining to improve blasting methods
2001 B. N. Kutuzov
Theoretical basis of an express method of explosive fracture assessment based on seismic signal parameters
2001 S. V. Lukichev
Determination of strength and abrasiveness of rocks by the spectrum of acoustic noise during drilling and cutting
2001 A. G. Arkhipov
Development of technical means to improve the safety of blasting operations in mines, hazardous in gas and dust
2001 Yu. V. Gorlov