Development of water-towering way of breaking wells in drilling and blasting operations at mining open pits
About authors
- 1 — Moscow Mining University
- 2 — Moscow Mining University
Abstract
The water cut of working benches in ore pits does not allow the wide use of the simplest types of explosives and causes the necessity of using water-resistant explosives, which significantly increases the cost of blasting operations. In cases when granulotols are used in watered boreholes, there is a very significant environmental load due to increased toxicity of explosion products and high dust-forming ability.
Область исследования:
(Archived) Without section
Funding:
None
Similar articles
Model of the granulometric composition of the fractured mined rock at the edge
2001 M. G. Menzhulin, G. P. Paramonov, S. V. Khokhlov
Calculation of the main parameters of drilling and blasting operations in the explosion of selective detonating explosive charges
2001 ZH. G. Dambaev, A. V. Zditovetskii, V. N. Kovalevskii
Mixed charge devices for emulsion explosives
2001 N. K. Shalygin, V. P. Glinskii, B. V. Matseevich, P. P. Markov
Justification of rational arrangement of the grid of rupture holes formed during explosive fracture to improve the quality of the pelletizing process based on the superposition of dynamic stress in two-dimensional space
2001 A. G. Fedorov