Directions for the development of comprehensive mechanization of blasting operations in the mines of Mountain Shoriya and Khakassia

Authors:
I. V. Mashukov1
A. N. Topkaev2
G. V. Goltsov3
V. N. Nikitin4
Yu. M. Karapetyan5
V. K. Dzhalov6
P. A. Filippov7
About authors
  • 1 — OOO VOSTNIGRI
  • 2 — OOO VOSTNIGRI
  • 3 — OAO Kuznetsk Metallurgical Plant
  • 4 — OAO Kuznetsk Metallurgical Plant
  • 5 — OAO Kuznetsk Metallurgical Plant
  • 6 — Kazsky mine Temirtau
  • 7 — OAO Sheregesh Mining Department
Date submitted:
2000-07-08
Date accepted:
2000-08-03
Date published:
2001-12-21

Abstract

Mechanization of blasting operations at underground mines in Gornaya Shoria and Khakassia began in the 1970s using granulated explosives and pneumatic charging equipment. Mines tested charging machines UZS-1500, UZS-6000, UZDM-1, 3MB, ZMBS-1 and ZMBS-2 developed by NIPIGormash company.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 148

Similar articles

Fracture energy capacity as a criterion for stability of building clay backfill
2001 L. K. Gorshkov, S. V. Naumov
Influence of explosion energy on the quality of rough diamonds
2001 A. T. Vedin, V. Ya. Konovalenko
Development of water-towering way of breaking wells in drilling and blasting operations at mining open pits
2001 G. G. Karkashadze, N. O. Taran
Scientific and practical issues of core preservation technology developed by VITR
2001 V. A. Kaulin, P. P. Ponomarev
Industrial explosives on bases of reconstituted (conversion) explosives
2001 N. K. Shalygin, B. V. Matseevich, V. P. Glinskii, O. F. Mardasov
Experimental simulation of the penetration of chemically active aerosol into destructible material
2001 S. D. Viktorov, N. G. Demchenko, A. P. Kuznetsov