Directions for the development of comprehensive mechanization of blasting operations in the mines of Mountain Shoriya and Khakassia
Authors:
About authors
- 1 — OOO VOSTNIGRI
- 2 — OOO VOSTNIGRI
- 3 — OAO Kuznetsk Metallurgical Plant
- 4 — OAO Kuznetsk Metallurgical Plant
- 5 — OAO Kuznetsk Metallurgical Plant
- 6 — Kazsky mine Temirtau
- 7 — OAO Sheregesh Mining Department
Abstract
Mechanization of blasting operations at underground mines in Gornaya Shoria and Khakassia began in the 1970s using granulated explosives and pneumatic charging equipment. Mines tested charging machines UZS-1500, UZS-6000, UZDM-1, 3MB, ZMBS-1 and ZMBS-2 developed by NIPIGormash company.
Область исследования:
(Archived) Without section
Funding:
None
Similar articles
Theoretical basis of an express method of explosive fracture assessment based on seismic signal parameters
2001 S. V. Lukichev
Expert method of reducing uncertainty in seismic safety calculations of blasting operations
2001 V. A. Belin, D. K. Potresov, N. I. Bukhanova
Intensity based on seismic scale, vibration velocity and distance reduction in blasting
2001 V. Kh. Pergament, Yu. E. Ovcharov, E. V. Goncharov
The degree of impact of crushing quality on the energy intensity of technological processes in the production of crushed stone
2001 A. I. Arsentev, O. N. Talamanova