Directions for the development of comprehensive mechanization of blasting operations in the mines of Mountain Shoriya and Khakassia

Authors:
I. V. Mashukov1
A. N. Topkaev2
G. V. Goltsov3
V. N. Nikitin4
Yu. M. Karapetyan5
V. K. Dzhalov6
P. A. Filippov7
About authors
  • 1 — OOO VOSTNIGRI
  • 2 — OOO VOSTNIGRI
  • 3 — OAO Kuznetsk Metallurgical Plant
  • 4 — OAO Kuznetsk Metallurgical Plant
  • 5 — OAO Kuznetsk Metallurgical Plant
  • 6 — Kazsky mine Temirtau
  • 7 — OAO Sheregesh Mining Department
Date submitted:
2000-07-08
Date accepted:
2000-08-03
Date published:
2001-12-21

Abstract

Mechanization of blasting operations at underground mines in Gornaya Shoria and Khakassia began in the 1970s using granulated explosives and pneumatic charging equipment. Mines tested charging machines UZS-1500, UZS-6000, UZDM-1, 3MB, ZMBS-1 and ZMBS-2 developed by NIPIGormash company.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 148

Similar articles

Influence of explosion energy on the quality of rough diamonds
2001 A. T. Vedin, V. Ya. Konovalenko
Fundamentals of Aseptic Baring of Subglacial Lake Vostok
2001 B. B. Kudryashov, A. N. Dmitriev, N. I. Vasilev
Scientific and practical issues of core preservation technology developed by VITR
2001 V. A. Kaulin, P. P. Ponomarev
Experimental studies on ice cutting
2001 N. I. Vasilev, V. M. Zubkov
Technology of explosive demolition of an industrial high-rise building with a metal bearing frame
2001 P. A. Filippov, A. P. Gaidin, I. V. Mashukov, L. M. Tsinker
Priority areas for the development of the coal, ore and construction oil mining industry by open pit mining to improve blasting methods
2001 B. N. Kutuzov