Submit an Article
Become a reviewer
Vol 148 Iss. 2
Pages:
68-71
Download volume:
RUS
Article

Directions for the development of comprehensive mechanization of blasting operations in the mines of Mountain Shoriya and Khakassia

Authors:
I. V. Mashukov1
A. N. Topkaev2
G. V. Goltsov3
V. N. Nikitin4
Yu. M. Karapetyan5
V. K. Dzhalov6
P. A. Filippov7
About authors
  • 1 — OOO VOSTNIGRI
  • 2 — OOO VOSTNIGRI
  • 3 — OAO Kuznetsk Metallurgical Plant
  • 4 — OAO Kuznetsk Metallurgical Plant
  • 5 — OAO Kuznetsk Metallurgical Plant
  • 6 — Kazsky mine Temirtau
  • 7 — OAO Sheregesh Mining Department
Date submitted:
2000-07-08
Date accepted:
2000-08-03
Date published:
2001-12-21

Abstract

Mechanization of blasting operations at underground mines in Gornaya Shoria and Khakassia began in the 1970s using granulated explosives and pneumatic charging equipment. Mines tested charging machines UZS-1500, UZS-6000, UZDM-1, 3MB, ZMBS-1 and ZMBS-2 developed by NIPIGormash company.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 148

Similar articles

Expert system of seismic safety of blasting operations
2001 V. A. Belin, D. K. Potresov, N. I. Bukhanova
Experimental studies on ice cutting
2001 N. I. Vasilev, V. M. Zubkov
Fracture energy capacity as a criterion for stability of building clay backfill
2001 L. K. Gorshkov, S. V. Naumov
Development of sealing and lubrication systems for bearings of high-speed roller bits
2001 Yu. G. Matveev, A. N. Popov, R. A. Ismakov, O. G. Blinkov, A. I. Moguchev, Yu. I. Samokhodov
Issues of fracture research in drilling explosive boreholes
2001 R. I. Sukhov, Yu. M. Lebedkin, A. V. Tymchur
Intensity based on seismic scale, vibration velocity and distance reduction in blasting
2001 V. Kh. Pergament, Yu. E. Ovcharov, E. V. Goncharov