Directions for the development of comprehensive mechanization of blasting operations in the mines of Mountain Shoriya and Khakassia

Authors:
I. V. Mashukov1
A. N. Topkaev2
G. V. Goltsov3
V. N. Nikitin4
Yu. M. Karapetyan5
V. K. Dzhalov6
P. A. Filippov7
About authors
  • 1 — OOO VOSTNIGRI
  • 2 — OOO VOSTNIGRI
  • 3 — OAO Kuznetsk Metallurgical Plant
  • 4 — OAO Kuznetsk Metallurgical Plant
  • 5 — OAO Kuznetsk Metallurgical Plant
  • 6 — Kazsky mine Temirtau
  • 7 — OAO Sheregesh Mining Department
Date submitted:
2000-07-08
Date accepted:
2000-08-03
Date published:
2001-12-21

Abstract

Mechanization of blasting operations at underground mines in Gornaya Shoria and Khakassia began in the 1970s using granulated explosives and pneumatic charging equipment. Mines tested charging machines UZS-1500, UZS-6000, UZDM-1, 3MB, ZMBS-1 and ZMBS-2 developed by NIPIGormash company.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 148

Similar articles

Expert system of seismic safety of blasting operations
2001 V. A. Belin, D. K. Potresov, N. I. Bukhanova
Issues in mechanical ice drilling
2001 I. G. Shelkovnikov
Principle of database construction for the expert system of seismic safety of blasting operations
2001 V. A. Belin, D. K. Potresov, A. D. Lvov
Experimental simulation of the penetration of chemically active aerosol into destructible material
2001 S. D. Viktorov, N. G. Demchenko, A. P. Kuznetsov
Scientific and practical issues of core preservation technology developed by VITR
2001 V. A. Kaulin, P. P. Ponomarev
Influence of explosion energy on the quality of rough diamonds
2001 A. T. Vedin, V. Ya. Konovalenko