Directions for the development of comprehensive mechanization of blasting operations in the mines of Mountain Shoriya and Khakassia

Authors:
I. V. Mashukov1
A. N. Topkaev2
G. V. Goltsov3
V. N. Nikitin4
Yu. M. Karapetyan5
V. K. Dzhalov6
P. A. Filippov7
About authors
  • 1 — OOO VOSTNIGRI
  • 2 — OOO VOSTNIGRI
  • 3 — OAO Kuznetsk Metallurgical Plant
  • 4 — OAO Kuznetsk Metallurgical Plant
  • 5 — OAO Kuznetsk Metallurgical Plant
  • 6 — Kazsky mine Temirtau
  • 7 — OAO Sheregesh Mining Department
Date submitted:
2000-07-08
Date accepted:
2000-08-03
Date published:
2001-12-21

Abstract

Mechanization of blasting operations at underground mines in Gornaya Shoria and Khakassia began in the 1970s using granulated explosives and pneumatic charging equipment. Mines tested charging machines UZS-1500, UZS-6000, UZDM-1, 3MB, ZMBS-1 and ZMBS-2 developed by NIPIGormash company.

Область исследования:
(Archived) Without section
Go to volume 148

Similar articles

Specifics of drilling flowing wells in intervals of unstable formations
2001 N. I. Nikolaev, E. Yu. Tsygelnyuk, N. S. Konokotov, N. A. Shatov
Electro-pulse method of rock fracturing and drilling wells
2001 D. V. Zhgun, V. F. Vazhov, M. Yu. Zhurkov
Expert system of seismic safety of blasting operations
2001 V. A. Belin, D. K. Potresov, N. I. Bukhanova
Environmental issues in building materials extraction
2001 Yu. V. Shuvalov, A. L. Gubenko, A. P. Bulbashev
Calculation of the main parameters of drilling and blasting operations in the explosion of selective detonating explosive charges
2001 ZH. G. Dambaev, A. V. Zditovetskii, V. N. Kovalevskii
Improvement of blasting operations at quarries in the south of Kuzbass
2001 I. V. Timoshin, A. V. Zykov