Engineering and environmental problems in the development of the V.P. Grib diamond deposit
About authors
- 1 — St. Petersburg Branch, Institute of Geoecology RAS
- 2 — St. Petersburg Branch, Institute of Geoecology RAS
Abstract
The methods of development of the V.P. Grib diamond deposit, characterized by complex engineering-geological and hydrogeological conditions, are considered. Based on the analysis of the conditions and taking into account the specifics of the geological structure, a combined method of development is proposed. The characteristic of the environmental problems arising with this method is given and engineering ways of their solution are outlined.
Область исследования:
(Archived) Modern problems of geotechnical and hydrogeological surveys
Similar articles
Engineering-geological and geoecological studies of the impact of operational factors on the stability of civil and industrial structures
2003 R. E. Dashko, L. P. Norova
Current state and peculiarities of the development of engineering geology in the Urals
2003 S. G. Dubeikovskii, V. P. Semakin
Carbonate karst in the East Urals region
2003 E. I. Afanasiadi, O. N. Gryaznov, S. G. Dubeikovskii, O. B. Neshchetkin
Challenges of engineering and geological research of the territory of Irkutsk
2003 I. I. Verkhozin, A. V. Samusenko, S. P. Nikiforov