Condition of the soil mass at the Moscow Canal hydroelectric complex No. 4 after seventy years of operation
About authors
- 1 — Hydroproject
- 2 — Hydroproject
Abstract
The state of the ground massif is evaluated according to three parameters: surface deformations, groundwater level position and filtration strength of the pounds. A conclusion is made about the unsatisfactory condition of the pound foundation of hydraulic unit No. 4, which requires measures for its stabilization.
Область исследования:
(Archived) Development regularities of technogenic and geological processes and phenomena
Funding:
None
Similar articles
Far Eastern State University of Railway Transport Assessment of landslide hazard in rock slopes of the Far Eastern Railway based on the study of fracturing
2003 S. V. Kvashuk, D. Yu. Maleev
Methods of hydrogeochemical mapping of karst territories
2003 A. Ya. Gaev, E. A. Ikonnikov, V. S. Samarina
Methodological aspects of studying karst in the exploration of the Vorontsovskoye gold ore deposit in the Northern Urals, to be developed by open-pit mining
2003 E. I. Afanasiadi, I. V. Abaturova, V. P. Novikov