Condition of the soil mass at the Moscow Canal hydroelectric complex No. 4 after seventy years of operation
About authors
- 1 — Hydroproject
- 2 — Hydroproject
Abstract
The state of the ground massif is evaluated according to three parameters: surface deformations, groundwater level position and filtration strength of the pounds. A conclusion is made about the unsatisfactory condition of the pound foundation of hydraulic unit No. 4, which requires measures for its stabilization.
Область исследования:
(Archived) Development regularities of technogenic and geological processes and phenomena
Similar articles
Mechanical properties of soils as a cause of inaccurate soil mechanics solutions
2003 E. N. Bogdanov, A. E. Bogdanov
Groundwater regime in southern Transbaikalia and its impact on the stability of frost-affected bases of structures
2003 P. I. Salnikov
Challenges of engineering and geological research of the territory of Irkutsk
2003 I. I. Verkhozin, A. V. Samusenko, S. P. Nikiforov
Hydrogeomechanical analysis of the tectonics and topography of the carbonate massif
2003 S. N. Tagiltsev, T. N. Kibanova