Submit an Article
Become a reviewer
Vol 153
Pages:
91-92
Download volume:
RUS
Article

Condition of the soil mass at the Moscow Canal hydroelectric complex No. 4 after seventy years of operation

Authors:
E. Yu. Nesynova1
A. I. Yudkevich2
About authors
  • 1 — Hydroproject
  • 2 — Hydroproject
Date submitted:
2002-06-10
Date accepted:
2002-07-14
Date published:
2003-03-20

Abstract

The state of the ground massif is evaluated according to three parameters: surface deformations, groundwater level position and filtration strength of the pounds. A conclusion is made about the unsatisfactory condition of the pound foundation of hydraulic unit No. 4, which requires measures for its stabilization.

Область исследования:
(Archived) Development regularities of technogenic and geological processes and phenomena
Go to volume 153

Similar articles

Development of V.D. Lomtadze's doctrine on the formation of physical and mechanical properties of clayey rocks during lithification
2003 E. I. Tkachuk
Prevention of dynamic destruction of solid rock layers in the soil of preparatory workings
2003 M. G. Mustafin
Stages of development, current state and prospects of monitoring of exogenous geological processes in the state monitoring of subsurface conditions in the Russian Federation
2003 O. V. Zerkal, V. V. Markaryan
Assessment of the probability of involvement in the development of mineral reserves with different levels of availability
2003 K. N. Trubetskoi, A. A. Peshkov, N. A. Matsko
Hydrogeology of Columbia
2003 V. A. Kiryukhin, O. N. De Bermudes
Challenges of training engineers in "Prospecting and Exploration of Groundwater and Engineering-Geological Surveying" specialty
2003 V. V. Antonov