Condition of the soil mass at the Moscow Canal hydroelectric complex No. 4 after seventy years of operation
About authors
- 1 — Hydroproject
- 2 — Hydroproject
Abstract
The state of the ground massif is evaluated according to three parameters: surface deformations, groundwater level position and filtration strength of the pounds. A conclusion is made about the unsatisfactory condition of the pound foundation of hydraulic unit No. 4, which requires measures for its stabilization.
Область исследования:
(Archived) Development regularities of technogenic and geological processes and phenomena
Funding:
None
Similar articles
Hydrogeological analysis of the Yuzhno-Gorkovskoe groundwater deposit using the method of mathematical modeling
2003 A. V. Mironova, V. G. Rumynin
A new approach in the development of engineering-geological typing of mineral deposits
2003 I. P. Ivanov, T. N. Nikolaeva
Changes in the geological environment during the development of iron ore deposits in the Angara province
2003 I. I. Verkhozin, I. V. Matveeva