Condition of the soil mass at the Moscow Canal hydroelectric complex No. 4 after seventy years of operation
About authors
- 1 — Hydroproject
- 2 — Hydroproject
Abstract
The state of the ground massif is evaluated according to three parameters: surface deformations, groundwater level position and filtration strength of the pounds. A conclusion is made about the unsatisfactory condition of the pound foundation of hydraulic unit No. 4, which requires measures for its stabilization.
Область исследования:
(Archived) Development regularities of technogenic and geological processes and phenomena
Funding:
None
Similar articles
Features of karst processes by the example of the Urals
2003 A. Ya. Gaev, Yu. A. Kilin, S. G. Dubeikovskii, V. P. Semakin
Using the method of engineering-geological analogies to assess the properties of soils in engineering structures
2003 E. V. Melnik
Role of the Mining Institute and the Geological Committee in the organization and formation of the State Geological Service of Russia: A History in Persons
2003 A. Kh. Kagarmanov
Engineering-geological and geoecological studies of the impact of operational factors on the stability of civil and industrial structures
2003 R. E. Dashko, L. P. Norova