Condition of the soil mass at the Moscow Canal hydroelectric complex No. 4 after seventy years of operation
About authors
- 1 — Hydroproject
- 2 — Hydroproject
Abstract
The state of the ground massif is evaluated according to three parameters: surface deformations, groundwater level position and filtration strength of the pounds. A conclusion is made about the unsatisfactory condition of the pound foundation of hydraulic unit No. 4, which requires measures for its stabilization.
Область исследования:
(Archived) Development regularities of technogenic and geological processes and phenomena
Similar articles
Rationale for the necessity of hydrogeoecological monitoring at the Leningrad oil shale deposit
2003 N. S. Petrov, M. N. Kutyaikina, Yu. A. Norvatov, I. B. Petrova
Employment opportunities in St. Petersburg for young professionals in the field of engineering geology
2003 M. O. Zueva
Using the method of engineering-geological analogies to assess the properties of soils in engineering structures
2003 E. V. Melnik