Geomechanical justification of methods and means to ensure the stability of preparatory workings in zones of high rock pressure in layered massifs
Authors:
About authors
- Postgraduate student G.V. Plekhanov Saint Petersburg State Mining Institute
Abstract
Based on the analysis of mining and geological conditions of the Eastern Donbass offered a method of determining the value of the expected displacement of the contour of preparatory workings depending on their location relative to the excavation work. The graphs of displacement of roof rocks, changes of displacements of rocks in front and behind the face depending on the different resistance of the lining are given. Considered the formation of zones of broken rocks in the vicinity of mine workings and identified ways to ensure their stability.
Область исследования:
(Archived) Development of underground space
Similar articles
Reduction of dust emission from dusty surfaces of mining and smelting facilities
2003 S. A. Ilchenkova
Goals and objectives of passportization of stockpiles of formed technogenic deposits
2003 E. B. Gridina
Using fractal analysis to characterize the structure of the Alexandrinskoye ore deposit (Southern Urals)
2003 D. A. Petrov