Experience of using the SDL30 electronic level during tests of the Trinity Bridge
About authors
- 1 — St. Petersburg State Transport University
- 2 — St. Petersburg State Transport University
- 3 — St. Petersburg State Transport University
Abstract
The experience of using SDL30 electronic level during tests of the Trinity Bridge in St. Petersburg conducted in May 2003 is described. The deflections of spans were determined by the results of high-precision geometric leveling. The characteristics of the level used and some test results are given. The use of electronic levels significantly reduced the time of leveling and perform a large amount of work by one team of surveyors. It is proposed to use the electronic level, which allows to speed up significantly the measurement process and get rid of the routine work of processing the results.
Similar articles
Socio-economic substantiation of the rational use of real estate in the historic center of St. Petersburg
2004 K. S. Shanina
Optimization of costs of a mining company in the context of operational management
2004 N. A. Reinik
Surveying work on the construction of the cable-stayed bridge over the Neva River in St. Petersburg
2004 O. P. Sergeev
A study of the distortion of images taken with digital cameras
2004 K. N. Shkavera, Yu. N. Kornilov, A. S. Kirillova