Submit an Article
Become a reviewer
Vol 156
Pages:
214-216
Download volume:
RUS
Research article
Surveying and geodesy

From the experience of creating a high-altitude separation network in the construction of out-of-grade bridges

Authors:
E. S. Bogomolova1
O. N. Malkovskii2
About authors
  • 1 — St. Petersburg State Transport University
  • 2 — St. Petersburg State Transport University
Date submitted:
2003-06-24
Date accepted:
2003-07-08
Date published:
2004-09-09

Abstract

The issues of creating high-altitude networks to support the construction of large and out-of-grade bridges are considered. The main attention is paid to the transfer of marks through large water obstacles by methods of geometric and trigonometric leveling. Recommendations are given on methods of performing leveling on ice for rivers with stable ice cover, as well as for transferring marks on rivers in the absence of a stable ice cover. During transfer of marks the possibility of using modern electronic total stations is considered. Concrete examples of works on transfer of marks by leveling on ice (bridge crossing of the Kama river several kilometers long) are given, and also experience of creation of a height network during construction of the cable-stayed bridge through the Neva river in Saint Petersburg with the help of high precision levels and electronic total station is described.

Go to volume 156

Similar articles

Optimization of costs of a mining company in the context of operational management
2004 N. A. Reinik
Use of GIS-technologies for zoning the territory of Frunzensky District of St. Petersburg
2004 V. A. Kiselev, E. V. Semeoshenkova
Sonars for measuring the depth of blast wells
2004 V. A. Golovanov
Equalization of free spatial networks
2004 S. V. Tyurin
Parameter development of polymeric steel tie bolt of the field workings at the mine SUBR
2004 E. I. Mikulin, R. G. Minzaripov
Experience of using the SDL30 electronic level during tests of the Trinity Bridge
2004 E. S. Bogomolova, O. P. Sergeev, V. V. Sukhanov