Submit an Article
Become a reviewer
Vol 156
Pages:
211-213
Download volume:
RUS
Article

Geodetic breaking-down net for the bridge crossing of Kama river

Authors:
V. V. Gruzinov1
V. A. Kougiya2
O. N. Malkovskii3
V. D. Petrov4
V. I. Poletaev5
V. V. Sukhanov6
About authors
  • 1 — St. Petersburg State Transport University
  • 2 — St. Petersburg State Transport University
  • 3 — St. Petersburg State Transport University
  • 4 — St. Petersburg State Transport University
  • 5 — St. Petersburg State Transport University
  • 6 — St. Petersburg State Transport University
Date submitted:
2003-06-25
Date accepted:
2003-07-18
Date published:
2004-09-09

Abstract

The specifics of geodesic network creation for bridge transition across Kama River in the vicinity of Kazan are discussed. The construction of geodesic network consisting of regular shape figures was not possible due to the great length of the bridge transition, features characteristics of the locality and the position of control points, which were chosen for the commodity of construction. Linear-angular network gaunt along the axis of the transition was created. The network was based on the control points located on the short area. Due to these circumstances many additional measurements were done to achieve desirable precision of point positioning. The most reliable line of the net was determined using several variants of adjustment. This line was chosen as the initial for final calculations. The level lines were created in winter time on ice because the control points were separated by rivers. The created geodesic net was used during the following construction of piers of the bridges.

Область исследования:
(Archived) Surveying and geodesy
Go to volume 156

Similar articles

Competitiveness of FEC companies from the perspective of new organizational and technological measures
2004 Yu. R. Vyakhirev
Influence of depth on the stability of brine chambers, laid on the dome-type fields
2004 S. A. Tolstunov, S. P. Mozer
Express assessment of functional depreciation of real estate objects
2004 V. G. Gorelikov, L. K. Gorshkov
Calculation of the parameters of artificial pillars in the ascending order of deposit mining
2004 D. Yu. Minaev, E. I. Boguslavskii
Principle scheme for obtaining displacements and deformations of layers of the undermined strata with an undetermined mineral extraction line
2004 V. N. Gusev, V. N. Monakhov, V. V. Guryanov
Forecasting technique of tunnel exploitation stability of St. Petersburg underground
2004 A. G. Protosenya, E. G. Kozin