Submit an Article
Become a reviewer
Vol 156
Pages:
143-145
Download volume:
RUS
Article

Parameter development of polymeric steel tie bolt of the field workings at the mine SUBR

Authors:
E. I. Mikulin1
R. G. Minzaripov2
About authors
  • 1 — Specialized Design Institute SUBR-Project,Severouralsk
  • 2 — Specialized Design Institute SUBR-Project,Severouralsk
Date submitted:
2003-06-16
Date accepted:
2003-07-20
Date published:
2004-09-09

Abstract

The manufacturing application experience at SUBR mines of a steel-polymeric roof bolts is given. New parameters of roof bolts, for SUBR excavations, based on theoretical and practical researches are obtained. The results of experimental-industrial tests of lateral excavation supported by new designed steel-polymeric roof bolts are shown. The economical estimation of the steel-polymeric support is given.

Область исследования:
(Archived) Modern problems of geomechanics and geotechnology
Funding:

None

Go to volume 156

Similar articles

Determination of plumb line deviation components using space navigation system consumer equipment
2004 A. I. Yakovlev
Study of invariant properties of massif fracturing under conditions of homogeneous geological structure
2004 V. N. Gusev, A. S. Zarukin, A. N. Sheremet
Calculation of thermal stresses in the ground mass around the chamber, where the temperature is maintained by radioactive decay
2004 A. G. Protosenya, A. K. Chernikov, G. N. Zhurov
Estimation of deformation and strength characteristics of the tunnel's host rocks by seismic data
2004 O. V. Boiko
Development of St. Petersburg subway tunnel lining stress-strain state during operation
2004 M. O. Lebedev
Deriving the equations of surfaces of rotation by transforming the equation of the Earth ellipsoid
2004 S. A. Korobkov