Assessment of compliance of mining and backfill operations design parameters at Verkhnekamsk potash mines with mining and geological conditions from the perspective of geodynamic safety of the subsurface and the earth's surface
About authors
- 1 — Ural Research and Design Institute of Galurgy
- 2 — Ural Research and Design Institute of Galurgy
- 3 — Ural Research and Design Institute of Galurgy
Abstract
The methodology and results of the numerical estimation of the stress-strain state (SSS) of the undermined rock mass under the design parameters of mining operations at the First Berezniki potash mine are considered. The geological structure of the rock mass and the propensity of salt rocks to creep and relaxation are taken into account.
Область исследования:
(Archived) Modern problems of geomechanics and geotechnology
Funding:
None
Similar articles
Improving the efficiency of construction of conjunctions of capital mine workings through the use of anchoring
2004 E. V. Kiteleva, V. V. Pershin
Determination of latitude and azimuth without the aid of a chronometer by a star with unknown coordinates
2004 I. S. Pandul
Socio-economic substantiation of the rational use of real estate in the historic center of St. Petersburg
2004 K. S. Shanina
Development of St. Petersburg subway tunnel lining stress-strain state during operation
2004 M. O. Lebedev