Submit an Article
Become a reviewer
Vol 156
Pages:
110-112
Download volume:
RUS
Article

Improving the efficiency of construction of conjunctions of capital mine workings through the use of anchoring

Authors:
E. V. Kiteleva1
V. V. Pershin2
About authors
  • 1 — Kuzbass State Technical University
  • 2 — Kuzbass State Technical University
Date submitted:
2003-06-11
Date accepted:
2003-07-02
Date published:
2004-09-09

Abstract

On the basis of the analysis of the used types of anchor supports and calculation of their parameters the advanced technology of capital mine workings conjugations construction is developed and the field of its application is substantiated. By the example of construction of one of the conjunctions of Raspadskaya mine the technical and economic efficiency of the developed technological schemes is shown.

Область исследования:
(Archived) Modern problems of geomechanics and geotechnology
Funding:

None

Go to volume 156

Similar articles

Optimization of costs of a mining company in the context of operational management
2004 N. A. Reinik
Mathematical model of rock massif deformation and fracture
2004 A. G. Olovyannyi
Longitudinal studies of the stress-strain state of load-bearing structures in St. Petersburg Metro stations during operation
2004 N. I. Kulagin, K. P. Bezrodnyi, M. O. Lebedev
Mining of thick deposits within the boundaries of safety pillars with compacted filling of the mined-out space
2004 Kh. I. Aglyukov, A. E. Udalov, S. N. Zelentsov
State regulation of environmentally safe use of land resources at the present stage
2004 V. A. Pavlova
Regularities of the formation of the vault displacement during layered mining of ore deposits
2004 D. A. Potemkin