Submit an Article
Become a reviewer
Vol 156
Pages:
217-218
Download volume:
RUS
Article

Surveying work on the construction of the cable-stayed bridge over the Neva River in St. Petersburg

Authors:
O. P. Sergeev
About authors
  • St. Petersburg State Transport University
Date submitted:
2003-06-17
Date accepted:
2003-07-13
Date published:
2004-09-09

Abstract

The Department of Engineering Geodesy of the University of Railway Transport carries out geodesic works on the construction of the cable-stayed bridge across the Neva river in St. Petersburg. Two steel pylons of 124 m height each will hold on the steel cables – cable stays –the span of 670 m length (322 m – the river span and two shore spans of 174 m). The geodetic demarcation network for the bridge construction, including 51 points, was created with the use of electronic total stations and the GPS satellite system. Electronic total stations from "Leica", "Sokkia", "Topcon" with an accuracy of angles measurements of 2-3" and distances (2 + 2·10-6S) mm allow with high accuracy to mount the blocks of the pylon and the superstructure. Deformations of pylons and span arising due to the influence of wind and uneven heating by the sun, high requirements to the accuracy of installation of cable fastening devices in the span and pylons required the development of original methods of geodetic works with the use of laser and high-precision devices.

Область исследования:
(Archived) Surveying and geodesy
Go to volume 156

Similar articles

Evaluation of the influence of the blast pulse on the parameters of the blast funnel
2004 G. P. Zileev, A. G. Zileev
Influence of depth on the stability of brine chambers, laid on the dome-type fields
2004 S. A. Tolstunov, S. P. Mozer
On the problem of strict alignment of geodetic networks developed by a set of satellite navigation system stations
2004 A. V. Astapovich, M. Ya. Bryn, I. V. Koltsov, V. V. Sugako
Improvement of technological schemes of excavation areas in the development of high-gas-bearing coal seams at great depths
2004 A. V. Montikov, A. P. Gospodarikov, B. V. Bokii
Experience of using the SDL30 electronic level during tests of the Trinity Bridge
2004 E. S. Bogomolova, O. P. Sergeev, V. V. Sukhanov
State and prospects of using the railroad reference system
2004 V. I. Poletaev