Submit an Article
Become a reviewer
Vol 156
Pages:
202-204
Download volume:
RUS
Research article
Surveying and geodesy

Determining the area of a plot using the coordinates of additional points of its sides

Authors:
M. Ya. Bryn1
A. V. Astapovich2
A. I. Kondratev3
About authors
  • 1 — St. Petersburg State Transport University
  • 2 — St. Petersburg Branch of the Military Engineering University
  • 3 — St. Petersburg Branch of the Military Engineering University
Date submitted:
2003-06-22
Date accepted:
2003-07-08
Date published:
2004-09-09

Abstract

For a polygonal land plot with n vertices, it is proposed to determine along each side of the plot the coordinates of additional points. By performing a linear approximation on these data, n straight line equations can be obtained. The intersection of the (i – 1)th and ith straight lines will give the coordinates of the ith boundary marker, by which, using the known formulas, the area of the land lot can be calculated. Model studies of approximation accuracy and accuracy of determining the coordinates of boundary marks were made. It is shown that if the coordinates of intermediate points in every 2 meters along the sides of a square with side length 20 meters, the accuracy of definition of coordinates of boundary marks can be increased in 1.8 times and in 2.4 times if the points in every 1 meter. The corresponding number of times will also increase the accuracy of determining the area of the plot.

Go to volume 156

References

  1. Большаков В.Д. Уравнение геодезических построений: Справочное пособие / В.Д.Большаков, Ю.И.Маркузе, В.В.Голубев. М.: Недра, 1989. 413 с.
  2. Бронштейн И.Н. Справочник по математике для инженеров и учащихся втузов / И.Н.Бронштейн, К.А.Семендяев. М.: Наука, Гл. ред. физ.-мат. лит., 1986. 544 с.

Similar articles

Assessment of compliance of mining and backfill operations design parameters at Verkhnekamsk potash mines with mining and geological conditions from the perspective of geodynamic safety of the subsurface and the earth's surface
2004 S. A. Konstantinova, S. A. Chernopazov, V. E. Marakov
Mathematical model of rock massif deformation and fracture
2004 A. G. Olovyannyi
Development of St. Petersburg subway tunnel lining stress-strain state during operation
2004 M. O. Lebedev
Optimization of costs of a mining company in the context of operational management
2004 N. A. Reinik
Principle scheme for obtaining displacements and deformations of layers of the undermined strata with an undetermined mineral extraction line
2004 V. N. Gusev, V. N. Monakhov, V. V. Guryanov
From the experience of creating a high-altitude separation network in the construction of out-of-grade bridges
2004 E. S. Bogomolova, O. N. Malkovskii