Calculation of the parameters of artificial pillars in the ascending order of deposit mining
About authors
- 1 — G.V. Plekhanov Saint Petersburg Mining University
- 2 — G.V. Plekhanov Saint Petersburg Mining University
Abstract
The stress state of artificial monolithic pillars under the combined system of field development, which is affected by the rock pressure of hanging wall rocks and the active pressure of loose rock filling located in the chamber of the 2nd stage, was analyzed. As a result of calculations the optimum length of of the 1st stage chamber is 8 m, length of the 2nd stage II chamber is 40 m, hardening deposit strength is 3 MPa.
Область исследования:
(Archived) Modern problems of geomechanics and geotechnology
Funding:
None
Similar articles
Recommendations for investment feasibility studies in the design of geothermal power plants
2004 E. I. Boguslavskii
On the problem of environmental zoning of urban areas based on geographic information systems
2004 M. A. Nevskaya, V. A. Kiselev, E. I. Dompalm
Development of St. Petersburg subway tunnel lining stress-strain state during operation
2004 M. O. Lebedev
A study of the accuracy of distance measurement with the Leica DISTO Pro laser tape measure
2004 V. V. Petrov, K. N. Shkavera