Calculation of the parameters of artificial pillars in the ascending order of deposit mining
About authors
- 1 — G.V. Plekhanov Saint Petersburg Mining University
- 2 — G.V. Plekhanov Saint Petersburg Mining University
Abstract
The stress state of artificial monolithic pillars under the combined system of field development, which is affected by the rock pressure of hanging wall rocks and the active pressure of loose rock filling located in the chamber of the 2nd stage, was analyzed. As a result of calculations the optimum length of of the 1st stage chamber is 8 m, length of the 2nd stage II chamber is 40 m, hardening deposit strength is 3 MPa.
Область исследования:
(Archived) Modern problems of geomechanics and geotechnology
Funding:
None
Similar articles
On the problem of environmental zoning of urban areas based on geographic information systems
2004 M. A. Nevskaya, V. A. Kiselev, E. I. Dompalm
Calculation of thermal stresses in the ground mass around the chamber, where the temperature is maintained by radioactive decay
2004 A. G. Protosenya, A. K. Chernikov, G. N. Zhurov
Forecasting technique of tunnel exploitation stability of St. Petersburg underground
2004 A. G. Protosenya, E. G. Kozin
Influence of depth on the stability of brine chambers, laid on the dome-type fields
2004 S. A. Tolstunov, S. P. Mozer