Calculation of the parameters of artificial pillars in the ascending order of deposit mining
About authors
- 1 — G.V. Plekhanov Saint Petersburg Mining University
- 2 — G.V. Plekhanov Saint Petersburg Mining University
Abstract
The stress state of artificial monolithic pillars under the combined system of field development, which is affected by the rock pressure of hanging wall rocks and the active pressure of loose rock filling located in the chamber of the 2nd stage, was analyzed. As a result of calculations the optimum length of of the 1st stage chamber is 8 m, length of the 2nd stage II chamber is 40 m, hardening deposit strength is 3 MPa.
Область исследования:
(Archived) Modern problems of geomechanics and geotechnology
Funding:
None
Similar articles
Regularities of the formation of the vault displacement during layered mining of ore deposits
2004 D. A. Potemkin
Longitudinal studies of the stress-strain state of load-bearing structures in St. Petersburg Metro stations during operation
2004 N. I. Kulagin, K. P. Bezrodnyi, M. O. Lebedev
Determination of plumb line deviation components using space navigation system consumer equipment
2004 A. I. Yakovlev
Principle scheme for obtaining displacements and deformations of layers of the undermined strata with an undetermined mineral extraction line
2004 V. N. Gusev, V. N. Monakhov, V. V. Guryanov