Investigation of the efficiency of the cutting slot to reduce seismic impact during tunnel construction
Authors:
About authors
- Research assistant G.V. Plekhanov Saint Petersburg Mining Institute
Abstract
The paper considers the issue of seismic protection of the environment and protected objects during drilling and blasting method of tunneling. It is shown that the creation of a cut-off slot reduces the amplitude values of seismic blast waves at least three times. This experimental fact made it possible to use the cut-off slit for tunneling the gallery of the Krasno-Polyansky tunnel using blasting.
Similar articles
Improvement of technology of construction of the middle tunnel of the metro station "Zvenigorodskaya"
2006 E. P. Reznikov
Possibility of application of satellite radio-navigation systems in modern construction
2006 V. G. Tselovalnikov
Stripping and preparation of new horizons at formation of a working zone of a quarry
2006 I. A. Ishkulova
Peculiarities of geological structure of Vasilievsky Island and their connection with the condition of the housing stock
2006 D. S. Kuznetsova