Investigation of the efficiency of the cutting slot to reduce seismic impact during tunnel construction
Authors:
About authors
- Research assistant G.V. Plekhanov Saint Petersburg Mining Institute
Abstract
The paper considers the issue of seismic protection of the environment and protected objects during drilling and blasting method of tunneling. It is shown that the creation of a cut-off slot reduces the amplitude values of seismic blast waves at least three times. This experimental fact made it possible to use the cut-off slit for tunneling the gallery of the Krasno-Polyansky tunnel using blasting.
Similar articles
Horizontal drilling is one of the priority directions of Surgutneftegaz innovation development
2006 E. I. Sapozhnikova
Prospects of application of mining equipment of domestic production at Kirov mine of OAO Apatit
2006 A. V. Skvortsov
Determination of rational location of sectional preparatory excavations at layer systems of development
2006 S. A. Sidorenko, A. A. Sidorenko