Investigation of the efficiency of the cutting slot to reduce seismic impact during tunnel construction
Authors:
About authors
- Research assistant G.V. Plekhanov Saint Petersburg Mining Institute
Abstract
The paper considers the issue of seismic protection of the environment and protected objects during drilling and blasting method of tunneling. It is shown that the creation of a cut-off slot reduces the amplitude values of seismic blast waves at least three times. This experimental fact made it possible to use the cut-off slit for tunneling the gallery of the Krasno-Polyansky tunnel using blasting.
Similar articles
Environmental assessment of Kostomuksha district of Karelia Republic on the basis of the results of ecological-geochemical research
2006 Ya. G. Panteleeva
Possibility of application of satellite radio-navigation systems in modern construction
2006 V. G. Tselovalnikov
Sorption treatment of mine water from fluorine and boron at the Yakovlevskoye site
2006 A. G. Stukkei
Experimental research stand for studying downhole processes of ARPD deposition
2006 Kh. A. Sarsenbaev