Stripping and preparation of new horizons at formation of a working zone of a quarry

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2005-06-10
Date accepted:
2005-07-27
Date published:
2006-01-01

Abstract

When forming the lower part of the working zone of the open pit - opening and preparation of new horizons - insufficient attention is paid to the shape of the excavated space of the lower horizon, which often cannot provide the most rational parameters of the blasted block, and therefore the maximum length of the mining front, which should compensate for the deficit arising from the mining front on the upper horizons. The present work provides the formation of the shape and parameters of the preparatory excavation, its position relative to the ore deposit and ensuring the maximum length of the mining front, taking into account the rational use of drilling and blasting.

Область исследования:
(Archived) Mining. Ecology
Go to volume 167

Similar articles

Symbolic character of communication of military servicemen
2006 E. I. Chirkova
Estimation of technogenic impact of tailing dump of Mikhailovsky MPP on adjacent agrolandscapes
2006 I. K. Ponurova
Preliminary assessment of economic potential of the North-West region of Russia from the point of view of Kyoto Protocol mechanisms
2006 A. A. Lavygin
Justification of resource-saving technological schemes of mining of powerful steep formations
2006 E. V. Glushchenkov
Oil economy of Russia: current state and prospects for the future
2006 L. P. Kardaenko
Environmental assessment of Kostomuksha district of Karelia Republic on the basis of the results of ecological-geochemical research
2006 Ya. G. Panteleeva