Submit an Article
Become a reviewer
Vol 167 Iss. 1
Pages:
67-69
Download volume:
RUS
Article

Stripping and preparation of new horizons at formation of a working zone of a quarry

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2005-06-10
Date accepted:
2005-07-27
Date published:
2006-03-30

Abstract

When forming the lower part of the working zone of the open pit - opening and preparation of new horizons - insufficient attention is paid to the shape of the excavated space of the lower horizon, which often cannot provide the most rational parameters of the blasted block, and therefore the maximum length of the mining front, which should compensate for the deficit arising from the mining front on the upper horizons. The present work provides the formation of the shape and parameters of the preparatory excavation, its position relative to the ore deposit and ensuring the maximum length of the mining front, taking into account the rational use of drilling and blasting.

Область исследования:
(Archived) Mining. Ecology
Funding:

None

Go to volume 167

Similar articles

About one algorithm of calculation of stressed state of salt reservoirs roof taking into account optimal choice of technological schemes parameters
2006 A. P. Gospodarikov, L. A. Bespalov, M. A. Zatsepin
Improvement of methodology of underground chambers and voids surveying
2006 N. M. Voluevich
Increase of reliability of systems of accounting and control of energy consumption at mining enterprises
2006 E. V. Tatarenkov
Logocentrism of Russian mentality: to the question of word meaning in Russian culture
2006 A. G. Kostina
Use of GIS-technologies for complex characterization of pro-spatial conditions of land use
2006 E. N. Bykova
Goals, tasks and content of environmental monitoring
2006 K. S. Shanina