Submit an Article
Become a reviewer
Vol 167 Iss. 1
Pages:
67-69
Download volume:
RUS
Article

Stripping and preparation of new horizons at formation of a working zone of a quarry

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2005-06-10
Date accepted:
2005-07-27
Date published:
2006-03-30

Abstract

When forming the lower part of the working zone of the open pit - opening and preparation of new horizons - insufficient attention is paid to the shape of the excavated space of the lower horizon, which often cannot provide the most rational parameters of the blasted block, and therefore the maximum length of the mining front, which should compensate for the deficit arising from the mining front on the upper horizons. The present work provides the formation of the shape and parameters of the preparatory excavation, its position relative to the ore deposit and ensuring the maximum length of the mining front, taking into account the rational use of drilling and blasting.

Область исследования:
(Archived) Mining. Ecology
Funding:

None

Go to volume 167

Similar articles

Nanostructural regulation and interrelation of water repellent and protective properties of coatings on steel
2006 A. G. Syrkov, A. N. Popova, I. V. Pleskunov, E. N. Kuleshov
Economic efficiency of diversification of metallurgical production of mining and metallurgical company
2006 A. M. Ivanov
Geomechanical substantiation of safe types and parameters of fasteners for fastening of excavations in loose ores
2006 D. B. Zykov
Environmental monitoring of the Krasny Bor toxic waste disposal site
2006 E. V. Eldina
Preliminary assessment of economic potential of the North-West region of Russia from the point of view of Kyoto Protocol mechanisms
2006 A. A. Lavygin
Expediency of application on the Russian market of polymer reagents of domestic production
2006 D. A. Dernov