Stripping and preparation of new horizons at formation of a working zone of a quarry

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2005-06-10
Date accepted:
2005-07-27
Date published:
2006-03-30

Abstract

When forming the lower part of the working zone of the open pit - opening and preparation of new horizons - insufficient attention is paid to the shape of the excavated space of the lower horizon, which often cannot provide the most rational parameters of the blasted block, and therefore the maximum length of the mining front, which should compensate for the deficit arising from the mining front on the upper horizons. The present work provides the formation of the shape and parameters of the preparatory excavation, its position relative to the ore deposit and ensuring the maximum length of the mining front, taking into account the rational use of drilling and blasting.

Область исследования:
(Archived) Mining. Ecology
Funding:

None

Go to volume 167

Similar articles

A geochemical and mineral associations of gold ore occurrences of Yanisyarvinsky area (South Karelia)
2006 O. A. Savicheva
Symbolism of the cross in archaic and Christian cultures
2006 R. V. Korchenkov, I. V. Trofimova
Thermodynamic study of extraction of cerium nitrate by oleic acid
2006 G. S. Roshchin
Determination of rational location of sectional preparatory excavations at layer systems of development
2006 S. A. Sidorenko, A. A. Sidorenko
Woman-manager in modern Russia
2006 B. Ya. Pukshanskii, E. A. Kanbekova
Increase of reliability of systems of accounting and control of energy consumption at mining enterprises
2006 E. V. Tatarenkov