Stripping and preparation of new horizons at formation of a working zone of a quarry

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2005-06-10
Date accepted:
2005-07-27
Date published:
2006-03-30

Abstract

When forming the lower part of the working zone of the open pit - opening and preparation of new horizons - insufficient attention is paid to the shape of the excavated space of the lower horizon, which often cannot provide the most rational parameters of the blasted block, and therefore the maximum length of the mining front, which should compensate for the deficit arising from the mining front on the upper horizons. The present work provides the formation of the shape and parameters of the preparatory excavation, its position relative to the ore deposit and ensuring the maximum length of the mining front, taking into account the rational use of drilling and blasting.

Область исследования:
(Archived) Mining. Ecology
Funding:

None

Go to volume 167

Similar articles

Expediency of application on the Russian market of polymer reagents of domestic production
2006 D. A. Dernov
Peculiarities of geological structure of Vasilievsky Island and their connection with the condition of the housing stock
2006 D. S. Kuznetsova
Justification of the methodology of determination of optimal normative payments and optimal strategies of the enterprise on environmental protection
2006 N. V. Gurova
Justification of requirements to ecological safety of diesel engines of transport machines for underground conditions
2006 K. A. Strebkov
Laws of distribution of concentration of solid particles during the flow of concentrated hydro-mixtures through pipelines
2006 I. A. Bostan, N. A. Ekimov
Justification of resource-saving technological schemes of potash strata mining in areas with limited dimensions
2006 D. V. Urazov