Submit an Article
Become a reviewer
Vol 167 Iss. 1
Pages:
67-69
Download volume:
RUS
Article

Stripping and preparation of new horizons at formation of a working zone of a quarry

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2005-06-10
Date accepted:
2005-07-27
Date published:
2006-03-30

Abstract

When forming the lower part of the working zone of the open pit - opening and preparation of new horizons - insufficient attention is paid to the shape of the excavated space of the lower horizon, which often cannot provide the most rational parameters of the blasted block, and therefore the maximum length of the mining front, which should compensate for the deficit arising from the mining front on the upper horizons. The present work provides the formation of the shape and parameters of the preparatory excavation, its position relative to the ore deposit and ensuring the maximum length of the mining front, taking into account the rational use of drilling and blasting.

Область исследования:
(Archived) Mining. Ecology
Funding:

None

Go to volume 167

Similar articles

Peculiarities of geological structure of Vasilievsky Island and their connection with the condition of the housing stock
2006 D. S. Kuznetsova
Goals, tasks and content of environmental monitoring
2006 K. S. Shanina
Improvement of individual protection means for works in conditions of the North
2006 S. N. Poltorykhin
Results of research of dust and gas cloud formation process at the quarry of OOO PG Phosphorit
2006 O. V. Tikhonova
Investigation of the efficiency of the cutting slot to reduce seismic impact during tunnel construction
2006 E. Yu. Vinogradova
Justification of requirements to ecological safety of diesel engines of transport machines for underground conditions
2006 K. A. Strebkov