Stripping and preparation of new horizons at formation of a working zone of a quarry

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2005-06-10
Date accepted:
2005-07-27
Date published:
2006-03-30

Abstract

When forming the lower part of the working zone of the open pit - opening and preparation of new horizons - insufficient attention is paid to the shape of the excavated space of the lower horizon, which often cannot provide the most rational parameters of the blasted block, and therefore the maximum length of the mining front, which should compensate for the deficit arising from the mining front on the upper horizons. The present work provides the formation of the shape and parameters of the preparatory excavation, its position relative to the ore deposit and ensuring the maximum length of the mining front, taking into account the rational use of drilling and blasting.

Область исследования:
(Archived) Mining. Ecology
Funding:

None

Go to volume 167

Similar articles

Symbolism of the cross in archaic and Christian cultures
2006 R. V. Korchenkov, I. V. Trofimova
Grapho-analytical method of determination of parameters of rod fastening of excavations on shock-hazardous deposits
2006 T. F. Kasumov
Experimental-industrial tests of lime hydrochemical treatment of nepheline sludge from alumina production
2006 A. V. Starshinov
Control of energy quality parameters in networks with nonlinear load
2006 S. Yu. Tyagushev, V. V. Sobolev
Selection of power supply scheme of compressor station with gas-turbine drive by reliability criterion
2006 S. V. Baburin
Prospects of development of horizontal technologies at development of oil and gas fields
2006 V. V. Feller