Stripping and preparation of new horizons at formation of a working zone of a quarry

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2005-06-10
Date accepted:
2005-07-27
Date published:
2006-01-01

Abstract

When forming the lower part of the working zone of the open pit - opening and preparation of new horizons - insufficient attention is paid to the shape of the excavated space of the lower horizon, which often cannot provide the most rational parameters of the blasted block, and therefore the maximum length of the mining front, which should compensate for the deficit arising from the mining front on the upper horizons. The present work provides the formation of the shape and parameters of the preparatory excavation, its position relative to the ore deposit and ensuring the maximum length of the mining front, taking into account the rational use of drilling and blasting.

Область исследования:
(Archived) Mining. Ecology
Go to volume 167

Similar articles

Strategic analysis of diversification of gas company
2006 N. P. Galaida
Safety of blasting operations with industrial explosives based on utilized powders
2006 S. Yu. Semenyak
Comparative analysis of methods for determining qualitative characteristics of facing stone of the Karelian Isthmus
2006 A. Ya. Tutakova
Isotherm of exchange of metal and sodium cations on ferromanganese nodules
2006 A. A. Chistyakov
Advantages of drilling out cylindrical stone products at quarries and methods of their separation from the rock massif
2006 D. G. Egorov
Cleaning of near-surface sediments from oil pollution in conditions of swamp landscapes of Western Siberia
2006 M. M. Malyshkin