Submit an Article
Become a reviewer
Vol 167 Iss. 1
Pages:
144-146
Download volume:
RUS
Article

Improvement of technology of construction of the middle tunnel of the metro station "Zvenigorodskaya"

Authors:
E. P. Reznikov
About authors
  • Research assistant G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2005-06-02
Date accepted:
2005-07-01
Date published:
2006-03-30

Abstract

The article considers the technology of construction of the middle station tunnel, the technology of erecting the lining of the upper and lower vaults of the deep subway station of column type. Also attention is paid to the improvement of the technology of construction of the middle tunnel by changing the organization of works, which entails a reduction in the duration of construction of this structure.

Область исследования:
(Archived) Development of underground space
Funding:

None

Go to volume 167

Similar articles

Influence of fine fractions on hydrostructure of solid particles of copper ore dressing tailings
2006 S. E. Demyanov
Research of strength and deformation properties of hydro-hematite ores of Yakovlevskoe deposit
2006 D. N. Petrov, D. B. Zykov
Peculiarities of zircon mineralization manifestation in pegmatites of Mamsko-Chuyskaya muscovite province
2006 E. S. Kiseeva
Woman-manager in modern Russia
2006 B. Ya. Pukshanskii, E. A. Kanbekova
Comparative analysis of methods for determining qualitative characteristics of facing stone of the Karelian Isthmus
2006 A. Ya. Tutakova
Conveyors with suspended belt for mining industry at the present stage of their development
2006 D. E. Lunev