Research of hydro-impact actuators of tunneling complex for Metrostroy of St. Petersburg
Authors:
About authors
- G.V. Plekhanov Saint Petersburg Mining Institute
Abstract
A tunneling complex for St. Petersburg Metrostroy with the use of a manipulator with a water hammer as an actuator is considered. It is proposed to use a dual impact system in the design of the water hammer for effective rock destruction. Works on research of twin impact systems at interaction with rocks of different properties are carried out. An experimental improved stand for the study of impact systems in interaction with rocks has been created.
Область исследования:
(Archived) Mining electromechanics
Funding:
None
Similar articles
Main directions of perfection of economic mechanism of reproduction of mineral raw material base at the present stage
2006 L. A. Nikolaichuk
Adaptation of geographical information system in net water-supply and sewage enterprises
2006 Ewa Wajs
Use of bioactive substances at recultivation of bulk dumps and technogenic formations
2006 N. A. Gasparyan