Research of hydro-impact actuators of tunneling complex for Metrostroy of St. Petersburg
Authors:
About authors
- G.V. Plekhanov Saint Petersburg Mining Institute
Abstract
A tunneling complex for St. Petersburg Metrostroy with the use of a manipulator with a water hammer as an actuator is considered. It is proposed to use a dual impact system in the design of the water hammer for effective rock destruction. Works on research of twin impact systems at interaction with rocks of different properties are carried out. An experimental improved stand for the study of impact systems in interaction with rocks has been created.
Область исследования:
(Archived) Mining electromechanics
Funding:
None
Similar articles
Comparative estimation of accounting approaches to substantiation of expediency of formation of reserves under depreciation of financial investments
2006 V. E. Soboleva
Calculation of maximum allowable working pressure at long-term operation of main oil product pipelines
2006 I. P. Abramov, I. Yu. Podavalov