Research of hydro-impact actuators of tunneling complex for Metrostroy of St. Petersburg
Authors:
About authors
- G.V. Plekhanov Saint Petersburg Mining Institute
Abstract
A tunneling complex for St. Petersburg Metrostroy with the use of a manipulator with a water hammer as an actuator is considered. It is proposed to use a dual impact system in the design of the water hammer for effective rock destruction. Works on research of twin impact systems at interaction with rocks of different properties are carried out. An experimental improved stand for the study of impact systems in interaction with rocks has been created.
Similar articles
Study of efficiency of geological and technical measures on increase of productivity of producing wells of OGPD Kinelneft
2006 I. A. Marinin
The implementation and optimizing of the informational systems in the company’s management
2006 Gabriela Gogoţ, Sorin Dobîrcianu
The strategy of national pit coal company – consequence of restructuring Romanian mining industry in the context of Romanian adhesion to the European union
2006 Diana Cornelia Csiminga