Submit an Article
Become a reviewer
Vol 170 No 2
Pages:
210-212
Download volume:

Development prospects of Nyurba Mining and Processing Plant

Authors:
O. A. Nechkina
About authors
  • G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2006-08-29
Date accepted:
2006-10-06
Date published:
2007-02-01

Abstract

The article is based on the materials collected during the production practice at the Nyurba Mining and Processing Plant of OAO ALROSA. The task of determining the prospects for development and improving the efficiency of the company's operations is set. It is proposed to build its own repair base for mining equipment, since its absence is a factor constraining further development of the plant.

Go to volume 170

Similar articles

Environmental condition of natural waters in the territory of the City of Tomsk
2007 E. Yu. Pasechnik
Mining subsidence – polish formal and legal solutions
2007 Dominika Kluska
Current problems in reactive distillation process control
2007 Ioana Georgescu, Gabriel Rădulescu
Environmental effect of air/fuel staging and flue gas recirculation on NOx formation - experimental and numerical analysis
2007 Poskart Monika, Lech Szecówka
Study of properties of granulated composite sorbents from peat-mineral mixtures
2007 A. E. Timofeev
Acoustic requirements for constructions in central Europe
2007 Pavel Oravec, Zdeněk Galda, Kateřina Kubenková