Submit an Article
Become a reviewer
Vol 170 Iss. 2
Pages:
113-116
Download volume:
RUS
Article

Run in hole and cementing of reinforced concrete columns in large diameter holes

Authors:
Gabriela Stan
About authors
  • Petroleum-Gas University of Ploiesti
Date submitted:
2006-08-20
Date accepted:
2006-10-19
Date published:
2007-04-11

Abstract

This paper presents an element of novelty in large diameter hole drilling in the form of the use of a reinforced concrete string. The method of construction, method of connection, methods of sinking and cementing the holes, and the many advantages of their use are presented.

Область исследования:
(Archived) Geodesy, geomechanics and underground construction
Go to volume 170

Similar articles

Features of operation of electric centrifugal pump units when forcing liquid withdrawal from wells of Samotlor oil field
2007 A. V. Kolonskikh
Development of the stand for research of microprocessor devices of relay protection and automatics
2007 M. A. Bychin
Three-product heavy-medium separator
2007 V. E. Tolkachev
A new method of investigation of blasting effects on buildings and structures using fiberglass cables
2007 K. Drebenstedt, S. Pessler
Theoretical analysis of metal flow velocity of bimetallic rod during extrusion process
2007 Szymon Berski, Grzegorz Banaszek, Henryk Dyja
Reservoir simulation study of PWF (patern water flood) in m Field In Indonesia
2007 Yuliarini Luh Mirah