Causes of formation of temporarily inoperable quarry sides and methods of their preservation by means of creation of bulk prism

Authors:
G. A. Kholodnyakov1
D. V. Teterin2
About authors
  • 1 — G.V. Plekhanov Saint Petersburg Mining Institute
  • 2 — G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2006-10-04
Date accepted:
2006-12-30
Date published:
2007-04-01

Abstract

For prevention of unwanted originating of non-working leases of a bead and running by them it is necessary to systematize and to analyse the reasons of their creation. The reasons of temporarily-non-working walls (TNWW) forming are expedient for partitioning on two base categoriesplanning and off-schedule. The internal reasons of creation TNWW are, as a rule, result of errors both defects at budgeting and conducting mining operations. Such reasons arise in internal system of activity of the operation.

Go to volume 172

Similar articles

Methodical aspects of estimation of the influence of geomechanical states of coal-bearing massifs on their filtration characteristics
2007 O. V. Kovalev, I. Yu. Tkhorikov, K. A. Bondarev
Analysis of influence of factors of the mineral raw materials market on the productivity of quarries
2007 S. I. Fomin, V. V. Ivanov, D. V. Pasynkov
Analysis and evaluation of the results of hydrogeochemical monitoring of groundwater to ensure the safety of mining operations at Yakovlevsky mine
2007 R. E. Dashko, A. A. Timchenko
Problems of development of raw material base of aluminum industry of Russia and organization of production in conditions of market economy
2007 A. G. Protosenya, O. V. Trushko
Features of the assessment of the impact of mining and industrial enterprises on water ecosystems
2007 D. S. Petrov, M. Yu. Ionova
Sonic location method of mine shaft sinking control by drilling
2007 V. K. Chumak, A. I. Naumenko