Causes of formation of temporarily inoperable quarry sides and methods of their preservation by means of creation of bulk prism

Authors:
G. A. Kholodnyakov1
D. V. Teterin2
About authors
  • 1 — G.V. Plekhanov Saint Petersburg Mining Institute
  • 2 — G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2006-10-04
Date accepted:
2006-12-30
Date published:
2007-04-01

Abstract

For prevention of unwanted originating of non-working leases of a bead and running by them it is necessary to systematize and to analyse the reasons of their creation. The reasons of temporarily-non-working walls (TNWW) forming are expedient for partitioning on two base categoriesplanning and off-schedule. The internal reasons of creation TNWW are, as a rule, result of errors both defects at budgeting and conducting mining operations. Such reasons arise in internal system of activity of the operation.

Go to volume 172

Similar articles

Experience of application of self-propelled pneumatic wheeled equipment for sinking of mine workings
2007 A. A. Kuleshov, V. Yu. Koptev
Features of mining of the Third potash formation of Starobinskoye Deposit in the zone of its wedging out
2007 V. P. Zubov, A. D. Smychnik
Mine observations on the condition of the fastenings of the horizontal excavations interfaces in weak ores
2007 D. N. Petrov
Rational designs of overlapping of the excavation conjugate support in the massif of iron-mica-martite ores of the Yakovlevskoye Deposit
2007 Yu. N. Ogorodnikov, V. I. Ochkurov
Analysis and evaluation of the results of hydrogeochemical monitoring of groundwater to ensure the safety of mining operations at Yakovlevsky mine
2007 R. E. Dashko, A. A. Timchenko
Principles of complex utilization of natural resources
2007 E. M. Pronin, A. G. Vasilev