To the issue of selection of the boundary criterion for rock shear muldes in the rock mass above the tunnel under construction
About authors
- 1 — G.V. Plekhanov Saint Petersburg Mining Institute
- 2 — G.V. Plekhanov Saint Petersburg Mining Institute
- 3 — G.V. Plekhanov Saint Petersburg Mining Institute
Abstract
This paper presents a method for determining the boundary criterion for the rock deformation zone in the rock mass above a tunnel under construction when using two-layer calculation schemes in forecasts of earth surface deformations. The method is applied to the conditions of construction of tunnels of the St. Petersburg subway system.
Область исследования:
(Archived) Mine survey
Funding:
None
Similar articles
Features of mining of the Third potash formation of Starobinskoye Deposit in the zone of its wedging out
2007 V. P. Zubov, A. D. Smychnik
Socio-economic development of coal-mining regions based on the assessment of environmental capacity of the natural environment
2007 Yu. V. Shuvalov, M. V. Parshina, E. P. Zuev, A. P. Veselov
Justification of rational methods of opening and mining of IV horizon in conditions of Starobinskoe potassium salt deposit
2007 E. R. Kovalskiy, K. A. Bondarev