Calculation of the loads on the arch support of the KMP-A3 excavations in the ore massif of the Yakovlevskoye iron ore deposit
About authors
- 1 — G.V. Plekhanov Saint Petersburg Mining Institute
- 2 — G.V. Plekhanov Saint Petersburg Mining Institute
- 3 — G.V. Plekhanov Saint Petersburg Mining Institute
Abstract
The scheme of vault hypothesis formation and the calculation method of loading on KMP-A3 arch support are presented. The presence of the outcrop contour in the ore massif of the Yakovlevskoye deposit is taken into account. Loads on the support in loose, medium-density and dense ores were determined.
Область исследования:
(Archived) Geomechanics
Funding:
None
Similar articles
Calculation of the parameters of the anchorage passport for the preparatory workings with the wire rope anchors in the conditions of the Vorkuta Mine
2007 A. A. Romashkevich
Justification of the pipeline transportation parameters of solidifying mixtures for the conditions of Yaregsky Mining and Chemical Complex
2007 I. E. Dolgiy, V. I. Vlasenko
Analysis and evaluation of the results of hydrogeochemical monitoring of groundwater to ensure the safety of mining operations at Yakovlevsky mine
2007 R. E. Dashko, A. A. Timchenko
Justification of rational methods of opening and mining of IV horizon in conditions of Starobinskoe potassium salt deposit
2007 E. R. Kovalskiy, K. A. Bondarev