Problems of prediction of loads on linings and stability of operated tunnels
About authors
- 1 — G.V. Plekhanov Saint Petersburg Mining Institute
- 2 — G.V. Plekhanov Saint Petersburg Mining Institute
- 3 — St. Petersburg Metro
Abstract
The results of in-situ measurements of vertical displacements of the tunnel lining of the St. Petersburg subway are presented. The 3d-model of interaction between soil and tunnel lining subjected to initial geostatic stress state is considered, and vertical displacements of the lining along the tunnel are used as an additional boundary condition. The calculated tangential stresses in the lining are compared with in-situ results of crack zone formation.
Область исследования:
(Archived) Geomechanics
Funding:
None
Similar articles
Temperature stresses in rock massif caused by stationary temperature field
2007 I. E. Dolgiy, V. I. Vlasenko
Calculation of the loads on the arch support of the KMP-A3 excavations in the ore massif of the Yakovlevskoye iron ore deposit
2007 Yu. N. Ogorodnikov, V. I. Ochkurov, A. B. Maksimov
Increase of technical and economic indicators of layer mining of thick hollow seams of Kuznetsk coal basin
2007 S. A. Sidorenko, A. A. Sidorenko, D. Yu. Nikishin
Mine observations on the condition of the fastenings of the horizontal excavations interfaces in weak ores
2007 D. N. Petrov