Problems of prediction of loads on linings and stability of operated tunnels
About authors
- 1 — G.V. Plekhanov Saint Petersburg Mining Institute
- 2 — G.V. Plekhanov Saint Petersburg Mining Institute
- 3 — St. Petersburg Metro
Abstract
The results of in-situ measurements of vertical displacements of the tunnel lining of the St. Petersburg subway are presented. The 3d-model of interaction between soil and tunnel lining subjected to initial geostatic stress state is considered, and vertical displacements of the lining along the tunnel are used as an additional boundary condition. The calculated tangential stresses in the lining are compared with in-situ results of crack zone formation.
Область исследования:
(Archived) Geomechanics
Funding:
None
Similar articles
Computational experiment modeling the joint action of mountain pressure, longitudinal and transverse seismic waves of mountain shock on mine workings
2007 V. V. Karpenko, A. V. Karpenko
Justification of rational methods of opening and mining of IV horizon in conditions of Starobinskoe potassium salt deposit
2007 E. R. Kovalskiy, K. A. Bondarev
Features of the assessment of the impact of mining and industrial enterprises on water ecosystems
2007 D. S. Petrov, M. Yu. Ionova
Geotechnological and environmental aspects of construction and operation of ductless heat pipelines in St. Petersburg
2007 L. K. Gorshkov, P. K. Tulin, N. G. Kikichev