Problems of prediction of loads on linings and stability of operated tunnels
About authors
- 1 — G.V. Plekhanov Saint Petersburg Mining Institute
- 2 — G.V. Plekhanov Saint Petersburg Mining Institute
- 3 — St. Petersburg Metro
Abstract
The results of in-situ measurements of vertical displacements of the tunnel lining of the St. Petersburg subway are presented. The 3d-model of interaction between soil and tunnel lining subjected to initial geostatic stress state is considered, and vertical displacements of the lining along the tunnel are used as an additional boundary condition. The calculated tangential stresses in the lining are compared with in-situ results of crack zone formation.
Область исследования:
(Archived) Geomechanics
Funding:
None
Similar articles
Justification of the pipeline transportation parameters of solidifying mixtures for the conditions of Yaregsky Mining and Chemical Complex
2007 I. E. Dolgiy, V. I. Vlasenko
Parameters of stress fields in the ore massif containing the parallel mutually influencing mine excavations
2007 Yu. N. Antonov
Geotechnological and environmental aspects of construction and operation of ductless heat pipelines in St. Petersburg
2007 L. K. Gorshkov, P. K. Tulin, N. G. Kikichev