Problems of prediction of loads on linings and stability of operated tunnels
About authors
- 1 — G.V. Plekhanov Saint Petersburg Mining Institute
- 2 — G.V. Plekhanov Saint Petersburg Mining Institute
- 3 — St. Petersburg Metro
Abstract
The results of in-situ measurements of vertical displacements of the tunnel lining of the St. Petersburg subway are presented. The 3d-model of interaction between soil and tunnel lining subjected to initial geostatic stress state is considered, and vertical displacements of the lining along the tunnel are used as an additional boundary condition. The calculated tangential stresses in the lining are compared with in-situ results of crack zone formation.
Область исследования:
(Archived) Geomechanics
Similar articles
Increase of efficiency and safety of mining works at coal stripping by large splinter
2007 S. A. Tolstunov, S. P. Mozer
Justification of the pipeline transportation parameters of solidifying mixtures for the conditions of Yaregsky Mining and Chemical Complex
2007 I. E. Dolgiy, V. I. Vlasenko
Analysis of influence of factors of the mineral raw materials market on the productivity of quarries
2007 S. I. Fomin, V. V. Ivanov, D. V. Pasynkov
Consideration of vertical asymmetry of shear distribution in the rock massif surrounding the tunnel under construction
2007 E. M. Volokhov