Problems of prediction of loads on linings and stability of operated tunnels
About authors
- 1 — G.V. Plekhanov Saint Petersburg Mining Institute
- 2 — G.V. Plekhanov Saint Petersburg Mining Institute
- 3 — St. Petersburg Metro
Abstract
The results of in-situ measurements of vertical displacements of the tunnel lining of the St. Petersburg subway are presented. The 3d-model of interaction between soil and tunnel lining subjected to initial geostatic stress state is considered, and vertical displacements of the lining along the tunnel are used as an additional boundary condition. The calculated tangential stresses in the lining are compared with in-situ results of crack zone formation.
Область исследования:
(Archived) Geomechanics
Funding:
None
Similar articles
Theoretical basis of calculation of mining-technical systems of heat regime regulation
2007 Yu. V. Shuvalov, A. F. Galkin
Calculation of the parameters of the anchorage passport for the preparatory workings with the wire rope anchors in the conditions of the Vorkuta Mine
2007 A. A. Romashkevich
Some data on the causes of structural failure of underground structures in St. Petersburg
2007 R. E. Dashko, E. Yu. Shatskaya, D. Yu. Vlasov
Parameters of direct longitudinal and transverse seismic waves of upland shocks in rocky rocks
2007 V. V. Karpenko, Yu. N. Ogorodnikov